Friday, 30 January 2015

30.01.2015

Turbine Building 16.0m level
Turbine Building 16.0m level
Turbine Building 16.0m level
Turbine Building 16.0m level
Turbine Building 16.0m level
Turbine Building 16.0m level
Turbine Building 16.0m level
Turbine Building overhead crane
Turbine Building
Excavation east of Turbine Building
Turbine Hall north view
Power block north view
Piperack cable pulling
Piperack piping and cable pulling
MCW piping to pump station
MCW piping
MCW piping connecting to pump station
Pump station
Overhead crane at pump station
Intake area
Intake area

Wednesday, 28 January 2015

29.01.2015

Turbine Building south view
Turbine Building condenser module
South view of MCW outfall culvert from turbine building
North view of MCW outfall culvert from turbine building
Outfall culvert turbine building to aeration
Condensate make up tank
Boiler electrical building south east view
Excavation east of Turbine building
Piperack to Boiler Electrical Building
Piperack to Boiler Electrical Building
Auxiliary boiler
Compressed air equipment
Retaining wall for light fuel oil storage tank
Waste water treatment plant

Tuesday, 27 January 2015

28.01.2015

Electrochlorination plant general view
Electrochlorination electrical building ground floor
Electrochlorination electrical building ground floor
Electrochlorination electrical building ground floor
Electrochlorination plant
Electrochlorination plant
Main cooling water piping
Main cooling water piping
Main cooling water piping
Main cooling water piping
Main cooling water piping
Main cooling water piping
Main cooling water pipe welding in progress
Pump station equipment
Pump station
Pump station steel structure
Intake area
Intake area
MCW pipe foundation in progress