Thursday, 7 February 2013

08.02.13

B01 - Boiler North Chipping of Foundation start

B01 - Boiler Foundation F11 Extraction of Sheet Pile

B01 - Boiler FD Fan preparation for rebar concrete cap

B02 - Chimney Excavation

L05 - Absorber preparation f or Excavation

L13 - Aeration Basin Spun Piling

B63 - Turbine Hall Sheet pile strutting

Panoramic View of Intake Area - looking South East

B06 - Bunker/Mills Erection Preparation works  (Survey)

Panoramic View of Intake Area - looking North West

Panoramic View of Switchyard

F01 - Switchyard Jack-in piling

Wednesday, 6 February 2013

06.03.13


L13 - Aeration Basin Spun Piling

F01 - Switchyard Jack-in piling

C04 - Coal Yard PVD Installation

E02 - CW Intake Pump house Sheet pile deliveries

B01 - Boiler PA Fan Foundation

C04 - Coal Yard area

B01 - Boiler Foundation F1 Pedestal

Tuesday, 5 February 2013

05.02.13

B63 - Turbine Hall Sheet pile strutting

E50 - CW Pipe Spun Piling

B63 - Turbine Hall Sheet piling
B01 - Boiler Foundation F11 Sheet pile removal

B01 - Boiler Foundation F10 Lean Concrete

B01 - Boiler Foundation F1 Pedestal

B06 - Bunker Bay Beam Slab shuttering

F01 - Switchyard Piling

E02 - CW Intake Sheet pile delivery

C04 - Coal Yard PVD Installation



04.02.13

E05 - CW Pipe Piling

B06 - Bunker / Mills Erection preparation works

B63 - Turbine Hall foundation sheet piling

B01 - Boiler North part backfilling

B01 - Boiler Cavity area & South Part Foundation works

B01 - Boiler Foundation pedestal F3

B01 - Boiler North part Backfilling (gravel)

L13 - Aeration Basin Spun Piling

B02 - Chimney Excavation