B01. Boiler Steel structure erection,
view from North
B01. Boiler Steel structure erection,
view form North
B01. Boiler Steel structure erection,
view from Bunker Bay
B01. Boiler Steel structure erection,
view from Bunker Bay
B01. Boiler Steel Structure erection,
view from South
B01. Boiler Steel structure erection,
view from South
B02. Chimney Slip form erection
B07. Fabric Filter - pile cap preparation
B10. ID Fan - Pile cap preparation
B17. Boiler flue gas duct foundation work
B33. Unit Electric building - ground floor erection
B33. Unit electrical building ground floor
- concreting
B33. Boiler electrical building,
tie-beam concreting work
B63. Turbine Hall North side - civil work
B63. Turbine Hall South side, view from North
B63. Turbine Hall- norhth side civil work, view from
South
B63. Turbine hall - Additional piling work,
view from South
B68. Tranformer Foundation - rebar installation,
view from South
E50. Cooling water culvert - Piling work
E50. Cooling water culvert - Piling work
L05. Absorber Foundation - Rebar installation
L10. Booster Fan - Foundation work
L13. Aeration Basin - piling work
L24. FGD Duct foundationo work
Piping fabrication at site.