| Turbine hall |
| Turbine hall |
| Turbine hall |
| Turbine hall south side |
| Turbine hall east side |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level -5.2m |
| Turbine hall Level -5.2m |
| Turbine hall Level -5.2m |
| Turbine hall Level -5.2m |
| Turbine hall Level -5.2m |
| Turbine hall Level -5.2m |
| Turbine hall Level -5.2m |
| Boiler view from north |
| Turbine hall view from west |
| Boiler PA/FD fans north side |
| FF Ash compressed station |
| FGD duct view from north |
| FGD duct view from north |
| FGD absorber |
| FGD |
| FGD absorber |
| FGD absorber |
| FGD view from west |
| FGD view from south |
| FGD aeration basin |
| FGD view from south |
| FGD aeration basin |
| FGD view from south |
| FGD aeration basin |
| FGD aeration basin pump station |
| Boiler electrical building |
| Waste water treatment plant |
| FGD aeration basin |
| FGD aeration basin |
| FGD aeration basin |
| FGD view from south |
| FGD aeration basin pump station |
| FGD aeration basin pump station |
| Boiler view from south |
| Waste water treatment plant |
| Waste water treatment plant |
| Waste water treatment plant electrical building |
| FGD aeration basin pump station |
| Waste water treatment plant |
| Boiler electrical building |
| Boiler view from south |
| Fabric filter south view |
| Piperack at Boiler electrical building rooftop |
| Boiler |
| Fabric filter view from south |
| FGD |
| ID fan |
| FGD |
| FGD piperack |
| FGD piperack and ID fan |
| Fabric filter view from south |
| FGD aeration basin |
| FGD aeration basin |
| Waste water treatment plant |
| FGD aeration pump station |
| Waste water treatment plant |
| FGD aeration basin |
| FGD |
| Piperack at Boiler electrical building rooftop |
| Waste water treatment plant |
| Waste water treatment plant |
| FGD aeration basin |
| Cables at Piperack H03 towards Boiler electrical building |
| Work area between Boiler and Piperack H03 |
| FGd aeration basin |
| FGD view from south |
| Booster fan view from south |
| ID fan |
| Fabric filter view from west |
| ID fan |
| FF ash compressed station |
| Fabric filter view from west |
| Crusher house |
| FF ash compressed station equipment |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.