| Turbine Hall view from west |
| Boiler scraper north side |
| Boiler pulverizers north side |
| MCW outlet headers from Turbine Hall |
| MCW outlet headers from Turbine Hall |
| B89b Gas storage and plant road north side |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Central Control Room |
| Engineering Room |
| Unit Electrical Building |
| MCW Piping |
| Industrial Water Treatment Plant |
| MCW Piping |
| Electrochlorination Plant |
| CWPH |
| Emergency Diesel Generator |
| Demin Plant |
| Raw water tanks |
| Demin tanks |
| IPB |
| Switchyard |
| Turbine hall view from east |
| Feed water tank at Turbine Hall |
| Hazardous Goods store |
| Demin plant |
| Compressed air station |
| Boiler acid waste pit ground levelling |
| Condensate Make up tank |
| Main transformer |
| Turbine Hall view from east |
| Condensate make up tank |
| Auxiliary boiler |
| Turbine Hall view from south |
| Boiler view from south |
| LFO tank |
| Unloading fuel oil station |
| Compressed air station |
| Boiler acid waste pit |
| Demin water tanks |
| Potable water tanks |
| Raw water tanks |
| Hazardous goods store |
| Turbine Hall view from east |
| Main Transformer |
| Turbine Hall view from east |
| IPB |
| B89a Gas storage |
| Turbine Hall view from north |
| Boiler view from north |
| Boiler view from north |
| Crusher House view from north |