Overall site photo on 18 - Jan 16
Plant general view from North |
Boiler area -North side |
Fabric filter area North side |
Slag conveyor system |
Slag conveyor system |
Boiler pulverizor area |
Turbine hall ground floor |
Turbine hall ground floor |
Main transformer area civil work |
Turbine hall 16 m level |
Turbine hall |
Turbine hall |
Turbine hall |
Turbine hall East side |
Turbine hall South side |
Turbine hall East side |
Fabric filter area South side |
Turbine hall South side |
Boiler area South side |
Waste water treatment area |
FGD pump station |
Waste water treatment Electrical building area |
FGD area East side |
Aeration fan |
FGD Area |
FGD Absorber area |
Ash handling system |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.