Friday, 13 February 2015

14.02.2015

Boiler north view
Boiler south view
Boiler south view
Fabric Filter north view
Fabric Filter and FGD south view
Turbine Hall north view
Material lifting at Turbine Hall
Turbine Hall headers
Large bore pipes in Turbine Hall
Large bore pipes in Turbine Hall
Large bore pipes in Turbine Hall
Turbine Hall Level 0.0m

Turbine Hall Level -5.2m
Turbine Hall east view
Excavation next to Turbine Hall east side
Temporary platform from Turbine Hall to Unit Electrical Building
Removal of Turbine Hall temporary stairs
Unit Electrical Building central control room
Unit Electrical Building central control room
Unit Electrical Building engineering room
Unit Electrical Building HVAC at rooftop
Main transformer area
Condensate make-up tank roofing installation
IPB installation
HV Switchyard
Turbine Hall south view
Piperack H03 connecting to Boiler Electrical Building
Boiler Electrical Building rooftop
Boiler Electrical Building HVAC room
Auxiliary Boiler building
FGD aeration basin
Aeration basin
Aeration basin
Demin tanks
Raw water tanks
Light fuel oil storage tank erection
Hazardous goods store
Demin plant
Waste water treatment plant
Excavation for FGD GRP piping
BC23AB
BC23AB
BC26AB

No comments:

Post a Comment

Note: only a member of this blog may post a comment.