Boiler north view |
Boiler south view |
Boiler south view |
Fabric Filter north view |
Fabric Filter and FGD south view |
Turbine Hall north view |
Material lifting at Turbine Hall |
Turbine Hall headers |
Large bore pipes in Turbine Hall |
Large bore pipes in Turbine Hall |
Large bore pipes in Turbine Hall |
Turbine Hall Level 0.0m |
Turbine Hall Level -5.2m |
Turbine Hall east view |
Excavation next to Turbine Hall east side |
Temporary platform from Turbine Hall to Unit Electrical Building |
Removal of Turbine Hall temporary stairs |
Unit Electrical Building central control room |
Unit Electrical Building central control room |
Unit Electrical Building engineering room |
Unit Electrical Building HVAC at rooftop |
Main transformer area |
Condensate make-up tank roofing installation |
IPB installation |
HV Switchyard |
Turbine Hall south view |
Piperack H03 connecting to Boiler Electrical Building |
Boiler Electrical Building rooftop |
Boiler Electrical Building HVAC room |
Auxiliary Boiler building |
FGD aeration basin |
Aeration basin |
Aeration basin |
Demin tanks |
Raw water tanks |
Light fuel oil storage tank erection |
Hazardous goods store |
Demin plant |
Waste water treatment plant |
Excavation for FGD GRP piping |
BC23AB |
BC23AB |
BC26AB |