| Boiler north view |
| Boiler air preheater |
| Boiler PA fan south |
| Fabric Filter north view |
| Turbine Hall west view |
| Turbine Hall +16.0m level |
| Turbine Hall +16.0m level |
| Turbine Hall +16.0m level |
| Turbine Hall +16.0m level |
| Turbine Hall +16.0m level |
| Turbine Hall +16.0m level |
| Turbine Hall +16.0m level |
| Turbine Hall - Lube oil room |
| Condensate make up tank |
| Unit Electrical Building east view |
| Unit Electrical Building control room |
| Unit Electrical Building engineering room |
| IPB erection |
| Main Transformer area |
| Boiler Electrical Building |
| FGD absorber area |
| Light fuel oil storage tank |
| Potable tank |
| Demin plant |
| Auxiliary boiler building |
| Piperack H03 |
| Hazardous goods store |
| Coal crusher house |