| Boiler view from north |
| Boiler view from north |
| Boiler PA/FD fans north side |
| Boiler view from north |
| Boiler view from south |
| Boiler electrical building view from south |
| Boiler view from south |
| Boiler PA/FD fans south side |
| Boiler PA/FD fans south side |
| Boiler south side |
| Boiler south side |
| Boiler south side - scaffolding removal |
| Boiler south side |
| Boiler view from south |
| Boiler view from south |
| Boiler view from south |
| Boiler scraper foundation |
| Boiler view from north |
| Boiler view from north |
| Turbine hall view from west |
| Turbine hall view from south |
| Boiler view from south |
| Turbine hall view from east |
| Turbine hall view from east |
| Turbine hall view from east |
| IPB view from north |
| Turbine hall view from east |
| Bulk tanks |
| Gas storage |
| Bulk tanks |
| Lifting of temporary steam blow tanks |
| Turbine hall view from north |
| Steam blow temporary piping |
| Turbine hall ground level |
| MCW outlet at Turbine hall |
| Lifting of temporary steam blow tanks |
| Lifting of temporary steam blow tanks |
| Fabric filter view from north |
| Fabric filter view from south |
| ID fan north side |
| FGD absorber |
| FGD duct to be lifted |
| FGD |
| FGD - GGH |
| FGD - GGH |
| FGD - GGH |
| FGD - Booster fan |
| FGD |
| FGD |
| FGD |
| FGD view from south |
| FGD view from south |
| Fabric Filter view from south |
| Boiler electrical building |
| FF air compressed station |
| FF air compressed station |
| FF air compressed station |
| FF air compressed station |
| Ash silos |
| Ash silos |
| Crusher house |
| FGD aeration basin area |
| FGD aeration basin area |
| FGD aeration basin area |
| FGD aeration basin area |
| FGD aeration basin pump station |
| FGD aeration basin |
| FGD aeration basin |
| FGD aeration basin |
| FGD aeration basin pump station |
| FGD aeration basin cable tray erection |
| FGD aeration basin pump station |
| FGD aeration basin cable pulling |
| FGD aeration basin cable pulling and GRP piping |
| Waste water treatment plant |
| Waste water treatment plant |
| Waste water treatment plant |
| Civil pit foundation |
| Civil pit foundation |
| Waste water treatment plant electrical building |
| Waste water treatment plant |
| Waste water treatment plant |
| Waste water treatment plant |
| Waste water treatment plant |
| Waste water treatment plant |
| Waste water treatment plant |
| Light fuel oil tank |
| Light fuel oil tank |
| Waste water treatment plant |
| Waste water treatment plant electrical building |
| LFO unloading station |
| LFO unloading station |
| LFO unloading station |
| Condensate make up tank |
| Condensate make up pumps |
| Auxiliary boiler |
| Auxiliary boiler |
| Air compressed station |
| Demin plant |
| Boiler acid waste pit |
| Boiler acid waste pit |
| Boiler view from east |
| Plant road preparation |
| Unit electrical building view from east |
| Emergency diesel generator |
| Unit electrical building view from east |
| Industrial waste treatment building |
| Main transformer yard |
| IPB view from south |
| Hazardous goods storage |
| Removal of sheet pile |
| Raw water tanks |
| Demin tanks |
| Potable water tank |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.