B89b Gas storage tank |
Bulk tanks near Turbine hall |
B89a Gas storage tank |
IPB outage work |
IPB outage work |
Turbine hall Level -5.2m - Sea water pit |
CPP |
CPP |
CPP |
CPP |
CPP |
CPP |
Turbine hall ground floor |
CPP |
CPP |
Turbine hall |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
IPB view from south |
Civil pit foundation at Boiler south |
Civil pit foundation at Boiler south |
FGD aeration pump station |
Waste water treatment plant |
FGD aeration basin |
FGD aeration basin |
FGD aeration basin |
FGD aeration basin |
FGD aeration basin |
FGD aeration basin |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.