| B89b Gas storage tank |
| Bulk tanks near Turbine hall |
| B89a Gas storage tank |
| IPB outage work |
| IPB outage work |
| Turbine hall Level -5.2m - Sea water pit |
| CPP |
| CPP |
| CPP |
| CPP |
| CPP |
| CPP |
| Turbine hall ground floor |
| CPP |
| CPP |
| Turbine hall |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| IPB view from south |
| Civil pit foundation at Boiler south |
| Civil pit foundation at Boiler south |
| FGD aeration pump station |
| Waste water treatment plant |
| FGD aeration basin |
| FGD aeration basin |
| FGD aeration basin |
| FGD aeration basin |
| FGD aeration basin |
| FGD aeration basin |