| Boiler view from north |
| Boiler view from north |
| Boiler PA/FD foundation north side |
| Boiler scraper equipment |
| Boiler scraper equipment |
| Boiler acid waste pit |
| Boiler acid waste pit as parking area |
| Demin plant |
| Air preheater washing basin foundation |
| Central control room |
| Central control room |
| Engineering room at Unit Electrical Building |
| Turbine Hall view from east |
| Turbine Hall view from east |
| Turbine Hall view from south |
| Turbine Hall view from east |
| Turbine Hall view from east |
| Turbine Hall view from north |
| Turbine Hall view from west |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Emergency diesel generator |
| MCW piping |
| Electrochlorination plant |
| CWPH |
| Auxiliary boiler |
| HV Switchyard |
| IPB |
| Main transformer area |
| Main transformer area |
| B89a Gas storage |
| B89b Gas storage |
| Unit Electrical Building |
| Light Fuel Oil unloading station |
| Light Fuel Oil tank |
| Condensate Make up tank |
| Condensate Make up tank |
| Condensate Make up tank |
| Raw water tanks |
| Demin water tanks |
| Raw water tanks |
| Hazardous goods store |
| Hazardous goods store |
| Auxiliary boiler |
| Auxiliary boiler |
| Auxiliary boiler |
| Compressed air station |
| Compressed air station |
| Industrial waste water treatment plant |
| Demin plant |
| Demin plant |
| Demin plant |
| Waste water treatment plant |