Boiler view from north |
Turbine Hall view from east |
Unit Electrical Building |
Central control room |
Unit Electrical Building |
Engineering Room |
HV Switchyard |
Turbine Hall view from east |
BOP |
WWTP |
Boiler acid waste pit |
Demin Plant |
CWPH |
Emergency Diesel Generator |
Turbine Hall insulation and wall cladding |
Turbine Hall Level +16.0m |
Turbine Hall Level +16.0m |
Turbine Hall Level +16.0m |
Turbine Hall Level +16.0m |
Turbine Hall Level +16.0m |
Turbine Hall Level +16.0m |
Turbine Hall Level +16.0m |
Turbine Hall Level +16.0m |
MCW header outlet at Turbine Hall |
B89b Gas Storage |
Boiler scraper equipment |
FF air compressed station |
Crusher House |
FGD view from west |
Aeration basin |
Aeration pump station cabling |
Air preheater washing basin |
Air preheater washing basin |
Boiler PA/FD fans south side |
Piperack H03 |
Boiler view from west |
FGD aeration pumping station |
WWTP |
Piperack H03 cabling |
FGD aeration stations |
WWTP Electrical Building |
Plant road south side |
LFO tank |
WWTP |
WWTP |
Fabric Filter view from south |
FGD view from east |
FGD cable rack |
FGD pipe rack |
FGD work area |
FGD aeration station |
FGD aeration station |
WWTP |
Boiler PA/FD fans south side |