B01. Power block general view from West



B07. Fabric filter hopper casing erection

B17. Flue Duct erection

B17. Flue gas steel structure erection


B35. Boiler electrical building Cable tray erection

B35. Boiler electrical building ground floor. Cable

B35. Boiler electrical building 1st floor civil work

C05. Crusher house building civil work

C71. Electrical building near Crusher house, ground floor
Cable tray and HVAC duct erection

D01. Ash storage Tank structure erection
(Tank 2 Concrete pouring in progress)

L05. Absorber shell concrete work

L13. Aeration basin civil work



L13. Aeration basin basement and side wall concrete work


L24. FGD Duct foundation work

B01. Boiler steek structure and pressure parts erection,
General view from North

B01. Boiler steel structure erection, view from North

B01. Boiler & pressure parts erection

B01. Pressure parts erection, view from bottom

B01. Boiler pressure parts erection
view from bottom


B01. Boiler pressure parts erection, view from bottom

B01. Pressure parts item shifting to site for erection

B01. Boiler pressure parts assembly

B01. Boiler steelstructure, pressure parts &
Silo duct erection, view from South

B01. Boier rear side boiler steel structure erection

B06. Pulerviser base erection


B06. Pulveriser erection view from South side


B06. Bunker bay area Silo Duct erection

B07. Fabric filter casing erection, view from East

B33. Unit electrical building general view from East


B33. Unit electrical building 1st flooring civil work


B33. Unit electrical building, general view from South

B33. Unit electrical building ground floor. cable tray erection

  
B33. Unit electrical building 3rd floor plastering work

B35. Boiler electrical building


B63. Turbine hall - Dosing system equipment

 
B63. Turbine hall - Condensate Tank alignment


B63. Turbine hall - condenser neck welding
and rebar installation of slab

B63. Turbine hall Steel structure erection,
View from B33


B63. Tubrine Hall Booster fan at site

B63. Turbine hall - steel structure erection, view from South


B63. Turbine hall- Vacuum pump







B63. Turbine hall steel structure erection, view from North

B68. Main Transformer at site

B68. Main transformer (3 unit) at site

B68. Auxiliary Transformer building load test

C03/30. Fuel oil pump station

C40. Light fuel oil storage



C72. Electrical building

D01. Ash storage tank erection

E05. Main cooling water piping foundation

E50. Main cooling water outfall culvert

F06. Cable way foundation


G05. Demin water production equipment erection

G05. Demin plant erection

G07.  Demin water storage erection

G20/G07. Demin tank erection

G08. Compressed air production building


G17. Auxiliary boiler foundation work


G20. Potable water storage erection

G25. Oper. industrial water pump station


G08/G25