| B01 - Boiler North View |
 |
| B01 - Pressure Part Erection Ongoing |
 |
| B63 - Steam Turbine Building Civil Work Ongoing |
 |
| G08 - Compressed Air Production Foundation and Column Work Ongoing |
 |
| B33 - Unit Electrical Building East View |
 |
| G25 - Indstrial Water Pumps Station Steel Erection Ongoing |
 |
| G07 - Demineralised Water Tank, Bottom Plate Installation Ongoing |
 |
| G02 - Raw Water Storage Asphalt Repair Completed |
 |
| B68 - Transformer Gravelling Removing and Rail Installation Ongoing |
 |
| F06 - HV Cable, Civil Work Ongoing |
 |
| E05 - Main Cooling Water Piping, Sleeper Work Ongoing |
 |
| B68 - Aux Transformer, Civil work Ongoing |
 |
| B63 - Steam Turbine Building, Civil Work Ongoing |
 |
| B63 - Steam Turbine Building, Civil Work Ongoing |
 |
| B01 - Boiler, Cavity and Tier Steel Beam Installation Ongoing |
 |
| D01 - Fly Ash Storage |
 |
| C05 - Coal Crusher House Civil Work Ongoing |
 |
| B17 - Flue Gas Ducts Erection Ongoing |
 |
| B07 - Fabric Filter, Casing Erection Ongoing |
 |
| B35 - Boiler Electrical building, Cable Tray Installation Ongoing |
 |
| L05 - FGD Absorber Concrete Work Ongoing |
 |
| L13 - FGD Aeration Bassin |
 |
| L13 - Aeration Bassin |
 |
| L13 - Aeration Bassin |
 |
| L13 - Aeration Bassin |
 |
| B63 - Steam Turbine Building, South View |
 |
| B33 - Unit Electrical Building |
 |
| E50 - Main Cooling Water Culverts ST. Hall to Aeration Bassin |
 |
| C30 - Fuel Oil Unloading Area |
 |
| G17 - Auxiliary Boiler, Rebar and RC work Ongoing |
 |
| ADV Module Assembly |
 |
| C30 - Fuel Oil Unloading Area |
 |
| G17 - Auxiliary Boiler |
 |
| G05 - Water Treatment Plant, Mechanical and Piping Installation Ongoing |
 |
| B64 - ST Foundation and Generator Foundation Block, Civil Ongoing |