B01 - Boiler North View |
|
B01 - Pressure Part Erection Ongoing |
|
B63 - Steam Turbine Building Civil Work Ongoing |
|
G08 - Compressed Air Production Foundation and Column Work Ongoing |
|
B33 - Unit Electrical Building East View |
|
G25 - Indstrial Water Pumps Station Steel Erection Ongoing |
|
G07 - Demineralised Water Tank, Bottom Plate Installation Ongoing |
|
G02 - Raw Water Storage Asphalt Repair Completed |
|
B68 - Transformer Gravelling Removing and Rail Installation Ongoing |
|
F06 - HV Cable, Civil Work Ongoing |
|
E05 - Main Cooling Water Piping, Sleeper Work Ongoing |
|
B68 - Aux Transformer, Civil work Ongoing |
|
B63 - Steam Turbine Building, Civil Work Ongoing |
|
B63 - Steam Turbine Building, Civil Work Ongoing |
|
B01 - Boiler, Cavity and Tier Steel Beam Installation Ongoing |
|
D01 - Fly Ash Storage |
|
C05 - Coal Crusher House Civil Work Ongoing |
|
B17 - Flue Gas Ducts Erection Ongoing |
|
B07 - Fabric Filter, Casing Erection Ongoing |
|
B35 - Boiler Electrical building, Cable Tray Installation Ongoing |
|
L05 - FGD Absorber Concrete Work Ongoing |
|
L13 - FGD Aeration Bassin |
|
L13 - Aeration Bassin |
|
L13 - Aeration Bassin |
|
L13 - Aeration Bassin |
|
B63 - Steam Turbine Building, South View |
|
B33 - Unit Electrical Building |
|
E50 - Main Cooling Water Culverts ST. Hall to Aeration Bassin |
|
C30 - Fuel Oil Unloading Area |
|
G17 - Auxiliary Boiler, Rebar and RC work Ongoing |
|
ADV Module Assembly |
|
C30 - Fuel Oil Unloading Area |
|
G17 - Auxiliary Boiler |
|
G05 - Water Treatment Plant, Mechanical and Piping Installation Ongoing |
|
B64 - ST Foundation and Generator Foundation Block, Civil Ongoing |