B01. Boiler steel structure - general view from North |
B01. Pressure parts item supper heater positioning for lift |
B06. Bunker bay area Silo duct roof steel structure erection and Boiler steel structure erection |
B06. Boiler Pulverizer basement shifting to site for erection |
B06. Boiler Pulverizer base erection |
B63. Turbine hall condenser neck installation |
B33. Unit electrical building 3rd floor civil work |
B33. Unit electrical building plastering work, General view from North |
B33. Unit electrical building - Transformer buidling area |
B33. Unit electrical building 2nd Floor |
B63. Turbine hall steel structure and condenser Neck erection |
B63. Turbine hall Steel structure erection, view from South side |
B63. Turbine hall - Vaccum pump installation |
B63. Turbine hall Steel structure erection, View from B33 Unit electrical building |
B68. Auxiliary Transformer building area civil work |
B68. Main transformer building completion |
B68. Main transformer building grating installation |
B68. Main transofermer at site |
B68. Auxiliary Transformer building - Load placed for Load test |
C40. Light fuel oil storage area |
TT24. Coal handling system tower erection |
C72. Electrial building near Bunker bay area |
E05. Main cooling water piping erection, view from Electrical building |
E05. Main cooling water piping sleeper foundation work |
G05. Demin water production pump erection |
G05. Demin plant steel structure erection |
G05. Demin plant general view from Unit Electrical building |
F06. Cable Way foundation |
F06. Cable way foundation |
G07. Demin water stroage tank erection |
G07. Demin. water storage tank erection |
G07. Demin water stroage tank erection - bottom area |
G08. Compressed air production building structure |
G08. Compressed air production building structure |