| B01 - Boiler South View |
| B01 - Boiler Pulverizer Base Installation Ongoing |
| B01 - Pressure Part Erection Ongoing |
| B01 - Pressure Part Erection Ongoing |
| TT24 - Steel Erection Ongoing |
| C72 - Coal Handling Electrical Bunker Civil Ongoing |
| B68 - Aux Transformer Pile Head and Excavation Ongoing |
| B68 - Aux Transformer Area |
| E05 - Main Cooling Water Piping, Sleeper Work Ongoing |
| E05 - Main Cooling Water Piping, Sleeper Work Ongoing |
| B68 - Transformer Gravelling Removing and Rail Installation Ongoing |
| F06 - HV Cable, Civil Work Ongoing |
| B68 - Transformer Gravelling Removing and Rail Installation Ongoing |
| ADV Module Assembly On Position |
| B64 - ST Foundation and Generator Foundation Block, Civil Ongoing |
| B63 - Steam Turbine Building |
| B63 - Steam Turbine Building, Civil Work and Neck Installation Ongoing |
| B63 - Steam Turbine Building, Civil Work Ongoing |
| C40 - Light Fuel Oil Storage |
| C40 - Light Fuel Oil Storage North View |
| E50 - Main Cooling Water Culverts ST. Hall to Aeration Bassin |
| L13 - Aeration Bassin |
| L13 - Aeration Bassin |
| L43 - FGD Absorber Water Supply and Discharge Piping Area |
| L13 - Aeration Bassin |
| L13 - Aeration Bassin |
| B35 - Boiler Electrical building, Cable Tray Installation Ongoing |
| B35 - Boiler Electrical building, Cable Tray Installation Ongoing |
| B35 - Boiler Electrical building |
| B33 - Unit Electrical Building East View |
| B33 - Cable Tray Installation |
| B33 - Second Floor |
| G17 - Auxiliary Boiler, Rebar and RC work Ongoing |
| G17 - Auxiliary Boiler, Rebar and RC work Ongoing |
| G17 - Auxiliary Boiler Area |
| H03 - Pipe and Electrical Rack Area |
| C30 - Fuel Oil Unloading Area |
| C30 - Fuel Oil Unloading Area |
| F06 - HV Cable, Civil Work Ongoing |
| G25 - Indstrial Water Pumps Station Steel Erection Ongoing |
| G25 - Indstrial Water Pumps Station Steel Erection Ongoing |
| G02 - Raw Water Storage Asphalt Repair Completed |
| Demineralised Water Tank, Bottom Plate Installation Ongoing |
| G05 - Water Treatment Plant, Mechanical and Piping Installation Ongoing |
| G05 - Water Treatment Plant, Mechanical and Piping Installation Ongoing |
| B64 - Condenser Neck On Position |
| B63 - Steam Turbine Building, Civil Work Ongoing |
![]() |
| B64 - Condenser Neck On Position |
| L05 - FGD Absorber Concrete Work Ongoing |
| B07 - Fabric Filter, Casing Erection Ongoing |
| B17 - Flue Gas Ducts Erection Ongoing |
| B17 - Flue Gas Ducts Erection Ongoing |
| C05 - Coal Crusher House Civil Work Ongoing |
| D01 - Fly Ash Storage |
| G08 - Compressed Air Production Foundation and Column Work Ongoing |