B01 - Boiler South View |
B01 - Boiler Pulverizer Base Installation Ongoing |
B01 - Pressure Part Erection Ongoing |
B01 - Pressure Part Erection Ongoing |
TT24 - Steel Erection Ongoing |
C72 - Coal Handling Electrical Bunker Civil Ongoing |
B68 - Aux Transformer Pile Head and Excavation Ongoing |
B68 - Aux Transformer Area |
E05 - Main Cooling Water Piping, Sleeper Work Ongoing |
E05 - Main Cooling Water Piping, Sleeper Work Ongoing |
B68 - Transformer Gravelling Removing and Rail Installation Ongoing |
F06 - HV Cable, Civil Work Ongoing |
B68 - Transformer Gravelling Removing and Rail Installation Ongoing |
ADV Module Assembly On Position |
B64 - ST Foundation and Generator Foundation Block, Civil Ongoing |
B63 - Steam Turbine Building |
B63 - Steam Turbine Building, Civil Work and Neck Installation Ongoing |
B63 - Steam Turbine Building, Civil Work Ongoing |
C40 - Light Fuel Oil Storage |
C40 - Light Fuel Oil Storage North View |
E50 - Main Cooling Water Culverts ST. Hall to Aeration Bassin |
L13 - Aeration Bassin |
L13 - Aeration Bassin |
L43 - FGD Absorber Water Supply and Discharge Piping Area |
L13 - Aeration Bassin |
L13 - Aeration Bassin |
B35 - Boiler Electrical building, Cable Tray Installation Ongoing |
B35 - Boiler Electrical building, Cable Tray Installation Ongoing |
B35 - Boiler Electrical building |
B33 - Unit Electrical Building East View |
B33 - Cable Tray Installation |
B33 - Second Floor |
G17 - Auxiliary Boiler, Rebar and RC work Ongoing |
G17 - Auxiliary Boiler, Rebar and RC work Ongoing |
G17 - Auxiliary Boiler Area |
H03 - Pipe and Electrical Rack Area |
C30 - Fuel Oil Unloading Area |
C30 - Fuel Oil Unloading Area |
F06 - HV Cable, Civil Work Ongoing |
G25 - Indstrial Water Pumps Station Steel Erection Ongoing |
G25 - Indstrial Water Pumps Station Steel Erection Ongoing |
G02 - Raw Water Storage Asphalt Repair Completed |
Demineralised Water Tank, Bottom Plate Installation Ongoing |
G05 - Water Treatment Plant, Mechanical and Piping Installation Ongoing |
G05 - Water Treatment Plant, Mechanical and Piping Installation Ongoing |
B64 - Condenser Neck On Position |
B63 - Steam Turbine Building, Civil Work Ongoing |
B64 - Condenser Neck On Position |
L05 - FGD Absorber Concrete Work Ongoing |
B07 - Fabric Filter, Casing Erection Ongoing |
B17 - Flue Gas Ducts Erection Ongoing |
B17 - Flue Gas Ducts Erection Ongoing |
C05 - Coal Crusher House Civil Work Ongoing |
D01 - Fly Ash Storage |
G08 - Compressed Air Production Foundation and Column Work Ongoing |