| B01. Boiler steel structure, view from West |
| B01. Boiler steel structure & duct erection, view from North |
| B01. Boiler & Pressure parts erection, view from Bottom |
| B01. Pressure parts erection |
| B01. Pressure parts |
| B01. Boiler & presssure parts erection, view from bottom |
| B63. Condenser Cooling water outlet pipe installation |
| B63. condenser cooling water outlet pipe |
| B01. Boiler Hot & Cool air duct erection |
| B01. Boiler steel structure & silo duct erection, view from East |
| B01. Boiler Roof steel structure, Duct & pressure parts erection |
| B02. Liner can assembly and Sandblast |
| B02. Chimeny Liner Can Erection and Linning (Black color) |
| B02. Chimeny Liner can assembly and sandblasting |
| B06. Bunke bay area pulverizer erection, view from North |
| B06. Bunker bay area pulveriser erection, view from South |
| B07. Fabric filter casing erection |
| B07. Fabric filter casing erection |
| B17. Flue gas duct assembly and erection |
| B33. Unit electrical building plastering work |
| B33. Unit electrical building ground floor cable tray erection |
| B33. Unit Electrical building 1st floor |
| B33. Unit electrical building 3rd floor |
| B33. Unit electrical building, view from East |
| B35. Boiler electrical building ground floor Cable tray erection |
| B35. Boiler electrical building 1st floor placed Panel |
| B35. !st floor placed Panel |
| B63. Turbine hall Condensate Tank area |
| B63. Turbine hall Feed water pump and motor |
| B6. Mail cooling water filtering pump |
| B63. Turbine hall view from East |
| B63. Turbine hall 8m lvl HP heaters |
| B63. Turbine hall Steel structure erection 16m lvl |
| B63. Turbine hall view from South |
| B68. Auxiliary Transformer |
| B68. Main transformer installation |
| C03_30. Light fuel pump station and unloading area |
| C05. Crusher house building |
| C40. Light fuel oil storage tank erection |
| C71. Electrical building |
| D01. Ash storage tank structure erection |
| E50. Outfall culvert Turbine to Aeration |
| F06. Cable way foundation |
| G02. Raw water supply erection |
| G05. Demin water plant and tank erection |
| G05. Demin plant steel structure erection |
| G08. Compressed Air building and H03 Pipe rack foundation |
| G17. Auxiliary Boiler foundation |
| G25. Water pump station building |
| G28. Oil & Fire fighting water recovery pit |
| H03. Pipe rack foundation |
| L05. Absorber shell roof concrete work |
| L10. Booster Fan Lifting |
| L13. Aeration foundation work |
| L13. Aeration Basin foundation work |