Sunday, 6 July 2014

05.07.2014

B01. Boiler steel structure, view from South

B01. Boiler steel structure view from North

B01. Boiler pressure parts erection

B01. Boiler and pressure parts erection, view from Bottom


B01. Boier and pressure parts erection, view from bottom

B01. Pressure parts erection,
view from bottom

B01. pressure parts erection


B01. Boiler steel structure and duct erection view from South


B01.  Boiler steel structure, presssure  parts & duct erection,
view from West

B06. Bunker bay area pulerviser erection, view from North

B06. Silo duct and steel structure erection

B06. Bunker bay area pulveriser erection, view from Soth

B07. Fabric filter casing erection, view West


B17. Flue Gas duct assembly and erection, view from South

B33. Unit electrical building plastering work,
view from North


B33. Unit electrical building, view from East

B33. Ground floor cable tray work

B33. Ground floor fire fighting work

B33. 1st floor

B33. 3rd floor

B35. Boiler electrcal building

B35. Ground floor Cable tray erection

B63. Turbine building, view from North

B63, Turbine building, view from North



B63. Turbine building, 11m lvl,
HP heater & steel structure erection

B63. Turbine hall steel structure erection

B63. Turbine hall ground floor

B63. Turbine hall feed water pump and motor



B63. Turbine hall view, from South


B68. Main transformer installation

B68. Main transformer installation

B68. Auxiliary transformer building

B17. Flue gas duct and steel structure erection

C03_C30 Light fuel oil pump station building

C05. Crusher House building.

C40. Light fuel oil tank

C72. Electrical building

D01. Ash storage

E05. Cooling water under ground piping


E50. Ooutfall culvert Turbine hall to Aeration

F06. Cable way foundation

G02. Raw water storage tank erection



G05.. Demin water production plant erection




G07. and G20 Demin Tank erection

G08. Compressed Air building,
H03. Pipe rack foundation

G17. Auxilary boiler foundation


G25. Water pump station

G28. Oil & fire fighting water recovery pit


H03. Pipe rack foundation


L05. Absorber shell

L13. Aeration basin area