Sunday, 27 July 2014

27.07.2014




B01. Boiler Hot & Cool air duct erection view from North



B01. Boiler and pressure parts erection, view from bottom

B01. Boiler East area

B01. Boiler piping erection

B01. Boiler Steel structure general view from South

B01. Boiler Hot & Cool Air duct erection

B01. Boiler steel structure general view from West



B02. Chimney Flue liner can erection
 
B02. Chimney Lining


B06. Pulverizer erection

B01. Silo duct and steel structure ereciton, view from East

B06. Pulveriser erection, view from South

B07. Fabric filter erection, view from South


B07. Fabric filter erection, view from North

L05. Absorber roof concrete
B17. Flue Gas duct and steel structure erection

B17. Flue gas duct assembly and erection, view from South


B33. Unit electrical building general view from East

B33. Ground floor cable tray erection

B33. 1st Floor Cable tray erection

B33. Unit electrical building 2nd floor


B33. Unit electrical building 2nd flooring


B33. Unit electrical building plastering, view from South


B35. Boiler electrical building , Auxiliary transformer at site

B35. Ground floor cable tray erection


B35. Boiler electrical building, 1st floor
Switch gear and panels

B35. 1st floor Panels

B63. Turbine hall 16m lvl. HP heater and Desuperheater

B63. Turbine hall. condenser piping valve installation

B63. Turbine hall table erection

B63. Turbine hall general view from North

B63, Turbine hall Ground floor concrete, view from North

B63. Turbine hall erection, view from East




B68. Auxiliary Transformer installation


B68. Main transformer installation

C03 & 30. Light fuel oil pump station & unloading area




C05. Crusher house, Mechanical installation

C40. Light fuel oil storage tanke erection

C71. Electrical building near crusher house

C72. Electrical building near Crusher house

C72. Electrical building inside

D01. Ash stroage structure

E05. Under ground Cooling water piping sleeper foundation

E50. Outfall culvert Turbine hall to Aereation basin



F06. Cable way foundation

G02. Raw water supply storage tank erection


G05. Demin plant erection

G05. Demin plant erection

G20. Potable water storage tank erection


G08. Compressed Air building

G16. Waste water treatment plant area

G17. Auxiliary Boiler Installation

G17. Auxiliary Boiler installation

G17. Auxiliary Boiler Installation


G25. Water pump station building



G25. Water pump station motor installation

G25. Water pump station building overall view


G28. Oil & Fire Fighting water recovery pit

H03. Pipe rack near water pump station

H03. Pipe rack near Demin plant



L10. Booster fan installation


L13. Aeration basin

L24. FGD Duct foundation




E02. Cooling water pump station


No comments:

Post a Comment

Note: only a member of this blog may post a comment.