| Power Block general view from North |
| B01. Boiler area Hot and Cool air duct erection |
| B01. Boiler & Pressure parts erection |
| B01. Boiler erection, view from Bottom |
| B01. Boiler rear side duct erection |
| B01. Boiler pressure parts erection |
| B01. Boiler steel structure and Aird duct erection, view from South |
| B01. Boiler Hot and cool Air duct erection, south side |
| B01. Boiler steel structure general view from West |
| B02. Chimney Flue duct liner can erection |
| B06. Bunker bay area pulverizer erection, veiw from North |
| B06. Bunker bay area pulverizer erection, view from South |
| B07. Fabric filter casing erection |
| B17. Boiler flue gas duct and steel structure ereciton |
| L10. Booster fan erection |
| B33. Unit Electrical building plastering work, view from East |
| B33. Unit electrical building Switch gear panel Lifting |
| B33. Unit electrical building auxiliary transformer |
| B33. Unit electrical building ground floor cable tray erection |
| B33. Unit electrical building 2nd floor |
| B33. 3rd floor |
| B33. Unit electrical building plastering, view from North |
| B35. Boiler electrical building ground floor cable tray erection |
| B35. Boiler electrical building Panel installation |
| B35. Boiler electrical building switch gear and panel installation |
| B63. Cooling water outlet pipe installation |
| B63. STG Table concrete |
| B63. Turbine hall table concrete, general view from North |
| B63. Turbine hall North side pile cape preparation |
| B63. Turbine hall, steel structre and Mechanical erection General view from North |
| B63. Turbine hall 16m lvl HP Heater & Desuper heater installation |
| B63. Turbine hall 11m lvl |
| B63. Turbine hall steel structure erection, general view from South |
| B63. Turbine hall Feed water pump and motor alignment |
| B63. Turbine hall big bore pipeing erection |
| B63. Turbine hall condenser neck installation |
| B63. Turbine hall cooling water pump and pipe connection |
| B68. Auxiliary transform installation |
| B68. Auxiliary transformer installation |
| B68. Main transformer installation |
| B68. Auxiliary transformer overview |
| C03_30 Light fuel oil pump station |
| C05. Crusher house |
| C40. Light fuel oil storage tank erection |
| C72. Electrical building insdie |
| C72. Electrical building |
| D01. Ash storage tank erection |
| E05. Cooling water underground pipeing sleeper foundation |
| E50. Outfall culvert Turbine hall to Aerattion basin |
| F06. Cable way foundation |
| G02 Rawwater supply tank erection |
| G05. Demin plant erection |
| G05. Demin plant steel structure & Plant erection |
| G07. Potable water storage tank erection |
| G08. Air compressed building |
| G17. Auxiliary boiler installation |
| G20. Potable water storage tank erection |
| G25. Water pump station |
| G28. Oil & fire fighting water recovery pit |
| H03. Pipe reack near Demin tank |
| L05. Absorber sheel roof concrete |
| Booster fan erection |
| L13. Aeration basin |
| L13 Aeration basine pipeing erection |