Power Block general view from North |
B01. Boiler area Hot and Cool air duct erection |
B01. Boiler & Pressure parts erection |
B01. Boiler erection, view from Bottom |
B01. Boiler rear side duct erection |
B01. Boiler pressure parts erection |
B01. Boiler steel structure and Aird duct erection, view from South |
B01. Boiler Hot and cool Air duct erection, south side |
B01. Boiler steel structure general view from West |
B02. Chimney Flue duct liner can erection |
B06. Bunker bay area pulverizer erection, veiw from North |
B06. Bunker bay area pulverizer erection, view from South |
B07. Fabric filter casing erection |
B17. Boiler flue gas duct and steel structure ereciton |
L10. Booster fan erection |
B33. Unit Electrical building plastering work, view from East |
B33. Unit electrical building Switch gear panel Lifting |
B33. Unit electrical building auxiliary transformer |
B33. Unit electrical building ground floor cable tray erection |
B33. Unit electrical building 2nd floor |
B33. 3rd floor |
B33. Unit electrical building plastering, view from North |
B35. Boiler electrical building ground floor cable tray erection |
B35. Boiler electrical building Panel installation |
B35. Boiler electrical building switch gear and panel installation |
B63. Cooling water outlet pipe installation |
B63. STG Table concrete |
B63. Turbine hall table concrete, general view from North |
B63. Turbine hall North side pile cape preparation |
B63. Turbine hall, steel structre and Mechanical erection General view from North |
B63. Turbine hall 16m lvl HP Heater & Desuper heater installation |
B63. Turbine hall 11m lvl |
B63. Turbine hall steel structure erection, general view from South |
B63. Turbine hall Feed water pump and motor alignment |
B63. Turbine hall big bore pipeing erection |
B63. Turbine hall condenser neck installation |
B63. Turbine hall cooling water pump and pipe connection |
B68. Auxiliary transform installation |
B68. Auxiliary transformer installation |
B68. Main transformer installation |
B68. Auxiliary transformer overview |
C03_30 Light fuel oil pump station |
C05. Crusher house |
C40. Light fuel oil storage tank erection |
C72. Electrical building insdie |
C72. Electrical building |
D01. Ash storage tank erection |
E05. Cooling water underground pipeing sleeper foundation |
E50. Outfall culvert Turbine hall to Aerattion basin |
F06. Cable way foundation |
G02 Rawwater supply tank erection |
G05. Demin plant erection |
G05. Demin plant steel structure & Plant erection |
G07. Potable water storage tank erection |
G08. Air compressed building |
G17. Auxiliary boiler installation |
G20. Potable water storage tank erection |
G25. Water pump station |
G28. Oil & fire fighting water recovery pit |
H03. Pipe reack near Demin tank |
L05. Absorber sheel roof concrete |
Booster fan erection |
L13. Aeration basin |
L13 Aeration basine pipeing erection |