Monday, 25 August 2014

25.08.2014 - Power Block



Power block
B01. Boiler area

B01. Boiler & pressure parts erection, view from bottom



B01. Boiler rear side duct erection

B01. Pressure parts erection, view from bottom

B01. Boiler area general view from South

B01. Boiler Hot Cool Air duct erection, view South

B01. Boiler area general view from West


B06. Pulversizer erection, view from North

B06. Pulversizer erection, view from South

B07. Fabric filter casing erection, view from South


B17. Flue gas duct assembly and erection

B17. Flue gas duct steel structure and duct erection


B33. Unit electrical building, plastering work, view from North

B33. Ground floor cable erection

B33. 1st floor Switch gear panel Installation

B33. 1st floor Switch gear panel installation
B33. Unit electrical building 3rd floor

B68. Auxiliary transformer installation




B33. Unit electrical building, Auxiliary transformer


B35.  Boiler electrical building Cable tray erection

B35. Boiler electrical building Auxiliary transformer


B63. Turbine hall North side steel reabar insatallation for concrete slab


B63. Turbine hall general view from North

B63. Turbine hall - Civil Mechanical construction


B63. Turbine hall - Turbine table concrete, general view from
north


B63, General view from East



B63. LP heater installation




B63. Turbine hall general view from South

B63. TH. Large bore pipe erection

B63. Feed water pump and motor alignment



B63. TH. large bore pipe erection



B68. Auxiliary Transformer

B68. Main transformer installation

C03 &30 Fuel oil pump station

C05. Crusher house

C40. Tank erection

D01. Ash storage tank structure


E50. Outfall Culvert Turbine hall to Aeration basin

F06. Cable way to Switchyard foundation

G02. Raw water supply storage tanke


G05. Demin plant steel structure erection

G05. Demin plant equipment installation


G07. Demin water storage tank erection

G08. Compressor Air production building

G08. Air compresser equipment at site

G16. Waste water treatment plant civil work

G17. Auxiliary boiler installation



G25. Water pump station




L05. Absorber shell concrete work

L13. Aeration basin


L10.. Booster Fan area

Cable tray over bridge steel structure

No comments:

Post a Comment

Note: only a member of this blog may post a comment.