29.10.2014 - Aerial Photograph of 28 Oct 2014


Aerial Photograph on 28 - Oct-2014


Power block general view from East



Water Treatment area - East side



Switch yard

Cooling water piping installation

Plant East side - Tank erection

Power block general view from West

Fabric filter, FGD & Aeration Basin area


Aeration basin area


Autfall

Coal Handling System erection,South side

Coal handling system erection, veiw from North

Coal Handling system erection, general view from North

Cooling water Intake area

Laydown area

Laydown area

Laydown area

Sunday, 26 October 2014

26.10.2014 - Power Block area


Power block

B01. Boiler area, general view from North
(Site main entrance) 

B01. Boiler furnace wall lifting

B01. Boiler erecgtion, view from Bottom



B01. Boiler area, general view from South

B02. Chimney. Liner can erection, view from bottom

B06. Pulerviser erection,  view from North

B06. Pulverizer erection, view from South

B06. Fabric filter erection

B07. Fabric filter area, general view

B17. Flue gas duct and steel structure erection

B17. Flue gas duct erection,  booster fan steel structure ereciton

B33. Unit electrical building Transformer area,
Cable pulling


B33. Ground floor, MV cable pulling

B33. First floor, MV panel Cable termination

B33. Control room, civil work


B33. Unit electrical Roof area. HVAC work

B33. Unit electrical building general view, from South

B35. Boiler electrical building, general view from South


B63. Turbine hall area, condenser neck
and cooling water outlet pipe

B63. Turbine hall - large bore pipe erection

B63. Turbine hall - polish plant area

B63. Turbine hall general view from North
Preparation for generator lifting



B63. Condenser module positioning



B63. Turbine hall steel structure erection,
General view from South

B68. auxiliary transformer erection


B68. Main transformer erection


C03 & C30 - Fuel oil pump station area

C05. Crusher house


C40. Light fuel oil storage tank erection

D01. Ash stroage structure

E05. Cooling water under ground piping saddle foundation


E50. Outfall foundation Turbine hall to aeration



G02. Raw water supply stroage tank erection

G05.Demin plant equipment erection

G05. demin plant steel structure erection

G07. Potable water storage tank erection


G08. Air compresser building and h03 pipe rack erection

G16. Waster treatment plant

G17. Auxiliary boiler erection

G25. Water pump station


L05. Aboserber area
 
L13 Aeration basin area

L43. Absorber supply and discharge piping erection