21.10.2014 - Power Block


Power Block as of 21-10-2014


B63. Turbine hall - condenser moduel positioning


B63. Turbine hall - condenser module positioning,
view from North

Condenser module at site (second one)



B01. Boiler area general view from North
(Entrance of site)

B01. Boiler Hot & Cool air duct erection, view from North

B01. Boiler Air preheater erection

B33. Unit electrical building 1st floor - Cable pulling on Panel

B06. Bunker bay area pulveriser erection

B06. Fabric filter casing erection

B33. Unit electrical building - ground floor, MV cable pulling

B33. Unit electrical building 1st floor - cable pulling to panel

B33. Unit electrical building - control room, civil work

B33. Unit electrical building roof area - HVAC work

B63. Turbine hall North side, polish plant equipment erection
and steel structure erection


B63. Mail cooling water out let pipe & valve erection

B63. Turbine hall - large bore pipe erection

B63. Turbine hall, general view from North

B63. Turbine hall - Steel structure and Mechanical erection
veiw from North

B63. Turbine hall steel structure erection, view from North


B63. Turbine hall - general view from East


B68. Auxiliary transformer erection

B68. Main transformer erection


C03/30 - Fuel oil pump station & unloading area, steel structure
erection, C40. Fuel oil storage tank erection


C72. Electrical building - ground floor




H03. Pipe rack erection
G08. Air compresser building,  equipment erection

G17. Auxiliary boiler erection

G25. Water pump station, equipment and cable tray erection
G02. Raw water supply storage tank erection

G16. Waste water treatment plant
L13. Aeration tank erection


E05. Under ground cooling water piping saddle foundation work

G05. demin plant equipment erection, streel structure erection
G07 & G20. Demin stroage tank erection

B01. Boiler erection