Monday, 13 October 2014

13.10.2014 - Power Block




Power Block area
B01. Boiler area general view - from North


B01. Boiler - Furnance wall erection

B01. Boiler furnance wall erection

B01. Air preheater erection erection



B01. Boiler area general view from South

B01. Boiler duct and blow tank erection


B01. Air preheater erection

B01. Boiler & Preassure parts erection

B01. Boiler blow tank erection

B01. furnace wall preassembly

B06. Pulverizer erection


B07. Fabirc filter casing top area erection

B17. Flue gas duct and steel structure erection

B17. Flue gas duct and steel structure erection

B07. Fabric filter casing erection

B33. Unit electrical building transfomer area - cable pulling

B33. Unit electrical building general view from North

B33. Ground floor cable pulling


B33 Ground floor cable pulling

B33. First floor MV  switch gear installation

B33. LV switch gear installation


B68. Auxiliary transformer

B33. Unit electrical building - control room area

B33. 3rd floor

B33. Building roof area - HVAC

B33. Building roof area HVAC work

B33. 3rd floor panel erection

B33. 3rd floor panel erection

B35. Boiler electrical building cable pulling

B63. Turbine hall - cooling water outlet area,
and Piping erection


B63. Turbine hall general veiw from North


B63. Turbine hall general view from North


B63. Turbine hall, view from East , large bore pipe erection


B63. Condenser neck erection

B63. Turbine hall large bore pipe erection

B63. Turbine hall ground floor - piping erection


B63. Turbine hall general view from South

B68. Auxiliary transformer erection


B68. Main transformer erection

B68. Auxiliary transfer former erection


C05. Crusher house civil work

C03_30 Light fuel oil pump station area

C40. Light fuel oil storage tank

D01. Ash stroage structure

E05. Cooling water underground piping foundation work

E05. cooling water under gound pipe erecton

E505. Cooling water outfall Turbine hall to Aeration

G02. Raw water storage tank erection

G07. Demin water storage tank erection


G05. Demin plant  steel structure

G05. Demin plant equipment erection

B06. Pulverizer erection

C40. . Light fuel oil storage

G08. Air compressed building
H03. Pipe rack

G16. Waste water treatment plant


G17. Boiler erection

G25. Water pump station cable tray erection

G25. Water pump station
G02. Raw water supply storage tank

G08. Oil & fire fighting water recovery pit


H03. Pipe rack near Demin plant



L13. Aeration basin

L43. Absorber supply and discharge pipe erection

No comments:

Post a Comment

Note: only a member of this blog may post a comment.