Plant general view from East
 |
B01. Air preheater erection |
 |
B01. Air preheater erection |
 |
Boiler windbox area duct erection |
 |
B01. Boiler ereciton |
 |
B02. Pulverize & Piping erection |
 |
B01. Boiler erection generation view from Southh |
 |
B01. Boiler Cool and Hot duct erection |
 |
B06. Bunker bay area pulveriser erection |
 |
B06. Pulverizer erection, view from South |
 |
B07. Fabric filter casing erection, view from South |
 |
B10. ID fan erection |
 |
B17. Flue gas duct erection |
 |
L10. Booster fan area duct and steel structure erection
& B17 Flue gas duct erection |
 |
B33. Unit electrical building, 3rd floor |
 |
B33. Unit electrical building I&C cable termination |
 |
G05. Demin plant and H03 Pipe rack erection |
 |
B33. Unit electrical building roof area - HVAC work |
 |
B33. Ground floor cable pulling |
 |
B33. Auxilary transfomer area cable pulling & termination |
 |
B35. Boiler electrical building panel area -
cable pulling and termination |
 |
B63. Turbine hall - -05 level piping installation |
 |
B63. Polish plant area |
 |
B63. Turbine hall - large bore piping erection |
 |
B63. Turbine hall general view from North |
 |
B63. Excitation transformer and Bus bar(IPB) erection |
 |
B63. CCCW pump and large bore pipe erection |
 |
B63. Condenser model on position |
 |
B63. -0.5 level - booster pump and piping erection |
 |
B63.-0.5 Polish plant equipment erection |
 |
B63. Turbine hall general view from East |
 |
B33. LV panel cable termination |
 |
B33. LV Panel back energize for battery charge |
 |
B63. Turbine hall general view from East- equipment erection |
 |
B63. Turbine hall general veiw from South |
 |
B68. Main transformer erection |
 |
B68. Auxiliary transformer IPB erection |
 |
C30. Fuel oil unloading area |
 |
C40. Fuel oil storage tank erection |
 |
E05. Cooling water underground pipe erection |
 |
E50. Outfall from Turbine hall to Areation basine |
 |
HV cable pulling |
 |
G02 raw water storage tank erection |
 |
G05. Demin plant equipment erection |
 |
G07. Potable storage tank erection |
 |
G08. Air compressor building |
 |
G17. Auxiliary Boiler erection |
 |
Add caption |
 |
G25. Water pump station pump erection |
 |
G25. Water pump station |
 |
L05. Absorber |
 |
L10. Booster fan. duct and steel structure erection |
 |
L13 Areation basin |
 |
L41. Absorber Supply and discharge pipe erection |