Plant general - Power block
20-Nov-2014
 |
B01. Boiler duct and Air preheater erection |
 |
B01. Boiler area general view from North |
 |
B01. Boiler erection, furnance wall and bottom |
 |
B01. Boiler & duct erection |
 |
B01. Boiler Air preheater erection |
 |
B06. Funker bay area, pulverizer erection |
 |
B07. Fabric filter area |
 |
B07. Fabric filter casing and equipment erection |
 |
B17. FGD flue gas duct and steel structre erection |
 |
B33. Unit electrical building, panel cable pulling and termination |
 |
B33. Panel cable termination |
 |
B33. commissioning work |
 |
B33. Unit electrical building, Controll room |
 |
B33. Cable pulling and termination |
 |
B33. Roof HVC work and floor |
 |
B63. Turbine hall - polish plant general veiw from West |
 |
B63. Turbine hall general view from North |
 |
B63. Turbine hall large bore piping erection |
 |
B63. Turbine hall - Condenser moduel erection |
 |
B63. Turbine hall equipment erection |
 |
B63. Turbine hall - large pipe erection |
 |
B63. Turbine hall generator |
 |
B63. Turbine hall feed water tank positioning |
 |
B63. Turbine hall - Generator and Air heater tank |
 |
B68. Main transformer and Auxilary transforer - view from B33 |
 |
C73. Electrical building area, coal handling system erection |
 |
C05. Crusher house and roof steel structure erection |
 |
C40. Light fuel oil tank erection |
 |
F06. HV cable pulling |
 |
G02. Raw water storage tank erection &
G25. Water pump house |
 |
G05. Demin plant equipment and steel structure erection |
 |
G08. Air compressor building equipment and
H03. Pipe rack erection |
 |
G17. Auxiliary boiler equipment and steel structure erection |
 |
E50. Outfall Turbine hall to areation basin |
 |
L13. Aeration basin area |