B01. Lifting to site - condenser part |
B01. Boiler Furnace wall area |
B01. Air preheater erection |
B01. Wind bow duct erection |
B01. Boiler area general view from South |
B01. Boiler duct erection, view from South |
B02, Bunker bay area, pulversizer erection, view from North |
B07. Fabric filter casing ereciton |
L10. Booster fan area, steel structure and duct erection |
B33. Unit electrical building |
B63. Turbine hall steel structure and equipment erection |
B63. Polish plant area |
B63. Turbine hall area, general view from South |
B68. Auxiliary transfomer area |
B63. Polish plant area eequipment erection |
B63. Turbine hall, large bore pipe erection |
C30. Fuel oil unloading area |
C40. Fuel oil stroage tank erection |
E05. Cooling water under ground piping foundation work |
E50. Turbine hall to Aeration basin area - Outfall work |
F06. HV cable pulling |
Demin plant erection |
G17. Auxiliary boiler erection |