| Plant general view from East |
| B01. Boiler erection - bottom aarea |
| B01. Boiler erection general view from South |
| B10. ID fan erection |
| B10. & B07. Fabric filter casing and I D Casing assembly |
| B33. Unit electrical building panel and cable pulling |
| B33. Cable termination |
| B33. Cable termination |
| B33. Cable termination |
| B33. Unit electric building area ,HO3 cable rack erectoin |
| B33. Control room |
| B33. Unit electrical building roof area - HVAC work |
| B35. Boiler electrical building general view |
| B63. Turbine hall area - Polish plant equipment erection |
| B63. Turbine hall area general view from North |
| B63. Condenser module on position |
| B63.Turbine hall sid view |
| B63. Turbine hall - heaters and large bore pipe erection |
| B63. Turbine hall - feedwater tank erection |
| B68. Main transformer erection |
| B68. IPB erection |
| B68. Turbine hall area IPB erection |
| C30.Fuel oil unloading area |
| E05. Cooling water under ground piping foundation |
| H01. Sleeper way foundation |
| E50. Outfall foundation Trbine hall to Aration Basin |
| F06. Hv Cablepulling -(cable bridge) |
| G05. Demin plant - equipment erection |
| G17. Auxiliary boiler erecction |
| G25. Water pump station |
| L05. FGD Absorber |
| B33. Electrical buidling area Pipe rack erection |
| B!&. Flue gas duct erection |
| L13. Aeration basin civil work |
| L41. Absorber supply and discharge pipe erection |