Plant general view from East |
B01. Boiler erection - bottom aarea |
B01. Boiler erection general view from South |
B10. ID fan erection |
B10. & B07. Fabric filter casing and I D Casing assembly |
B33. Unit electrical building panel and cable pulling |
B33. Cable termination |
B33. Cable termination |
B33. Cable termination |
B33. Unit electric building area ,HO3 cable rack erectoin |
B33. Control room |
B33. Unit electrical building roof area - HVAC work |
B35. Boiler electrical building general view |
B63. Turbine hall area - Polish plant equipment erection |
B63. Turbine hall area general view from North |
B63. Condenser module on position |
B63.Turbine hall sid view |
B63. Turbine hall - heaters and large bore pipe erection |
B63. Turbine hall - feedwater tank erection |
B68. Main transformer erection |
B68. IPB erection |
B68. Turbine hall area IPB erection |
C30.Fuel oil unloading area |
E05. Cooling water under ground piping foundation |
H01. Sleeper way foundation |
E50. Outfall foundation Trbine hall to Aration Basin |
F06. Hv Cablepulling -(cable bridge) |
G05. Demin plant - equipment erection |
G17. Auxiliary boiler erecction |
G25. Water pump station |
L05. FGD Absorber |
B33. Electrical buidling area Pipe rack erection |
B!&. Flue gas duct erection |
L13. Aeration basin civil work |
L41. Absorber supply and discharge pipe erection |