Wednesday, 29 April 2015

29.04.2015

Boiler view from north
Boiler view from north
Fabric filter
Turbine hall view from west
Turbine hall view from north
Turbine hall level +0.00m
Turbine hall level +0.00m
Cooling water piping at Turbine hall
Cooling water piping at Turbine hall
Cooling water pipe foundation preparation to Turbine hall
Cooling water pipe foundation preparation
Cooling water pipe foundation preparation
Cooling water pipe foundation preparation
Turbine hall view from east
Turbine hall view from east
Auxiliary boiler
Auxiliary boiler
Auxiliary boiler
Auxiliary boiler sampling panel
Auxiliary boiler
Auxiliary boiler piping for commissioning blow out test
Auxiliary boiler piping for commissioning blow out test
Preparation for auxiliary boiler commissioning blow out test
Preparation for auxiliary boiler commissioning blow out test
Auxiliary boiler chimney

Monday, 27 April 2015

28.04.2015

Plant view from north
Power block view from east
Power block and switchyard view from east
Boiler and Turbine hall view from east
Tank farm view from east
Power block view from the electrochlorination plant
Electrochlorination plant
Electrochlorination plant
Electrochlorination plant
Electrochlorination electrical building ground floor cabling
Elecrochlorination electrical building ground floor cabling
Electrochlorination electrical building ground floor cabling
Electrochlorination electrical building first floor cabling
Electrochlorination electrical building first floor
Electrochlorination electrical building first floor
Electrochlorination electrical building first floor
Electrochlorination electrical building second floor
Electrochlorination electrical building second floor lightings
Electrochlorination electrical building second floor HVAC
Switchyard view from east
Electrochlorination electrical building rooftop
Electrochlorination plant rear view
Electrochlorination plant internal view
Electrochlorination plant internal view
Cabling into Electrochlorination electrical building
Electrochlorination plant rooftop
Electrochlorination plant internal view
MCW piping
MCW piping
MCW piping at CWPH
MCW piping at CWPH
MCW piping at CWPH
MCW piping at CWPH
MCW piping connection
MCW piping
MCW piping at CWPH
MCW piping connecting to CWPH
CWPH
CWPH
CWPH overhead crane
CWPH
CWPH
CWPH
CWPH
CWPH drum screen
CWPH
CWPH
CWPH drum screen
CWPH trash rake
CWPH steel structure
CWPH
CWPH cable tray
Intake area
Intake area
CWPH
CWPH steel structure
CWPH cable rack
Intake flooding
Intake flooding
Intake
Cable trays and cabling
GRP piping
Piping
Piping and cable trays
Cable trays
Cable trays
Piping
Piping
Cable trays
Cable trays