Turbine hall +16.0m level |
Turbine hall +16.0m level |
Turbine hall Lube oil room |
Turbine hall Lube oil room |
Boiler acid waste pit |
Demin plant |
Light fuel oil tank |
Piperack H03 |
Piperack H03 |
Aeration basin |
MCW piping |
IPB |
Cooling water piping at Turbine hall |
IPB |
Turbine hall +16.0m level |
Lube oil flushing preparation |
Lube oil room at Turbine hall |
Turbine hall +16.0m level |
Turbine hall +16.0m level |
Turbine hall +16.0m level |
Turbine hall +16.0m level |
Turbine hall generator at +16.0m level |
Turbine hall generator at +16.0m level |
Turbine hall +16.0m level |
Turbine hall Lube oil room |
Cooling water piping at Turbine hall |