| Boiler view from north |
| Boiler view from north |
| Fabric filter |
| Turbine hall view from west |
| Turbine hall view from north |
| Turbine hall level +0.00m |
| Turbine hall level +0.00m |
| Cooling water piping at Turbine hall |
| Cooling water piping at Turbine hall |
| Cooling water pipe foundation preparation to Turbine hall |
| Cooling water pipe foundation preparation |
| Cooling water pipe foundation preparation |
| Cooling water pipe foundation preparation |
| Turbine hall view from east |
| Turbine hall view from east |
| Auxiliary boiler |
| Auxiliary boiler |
| Auxiliary boiler |
| Auxiliary boiler sampling panel |
| Auxiliary boiler |
| Auxiliary boiler piping for commissioning blow out test |
| Auxiliary boiler piping for commissioning blow out test |
| Preparation for auxiliary boiler commissioning blow out test |
| Preparation for auxiliary boiler commissioning blow out test |
| Auxiliary boiler chimney |