Friday, 3 April 2015

03.04.2015

Turbine hall Lube oil room
Turbine hall +16.0m level
Turbine hall +16.0m level
Turbine hall Lube oil room
Turbine hall Lube oil room
Turbine hall Lube oil room
Turbine hall Lube oil room
Turbine hall +16.0m level
Turbine hall +16.0m level
Turbine hall +16.0m level
Turbine hall +16.0m level
Turbine hall +16.0m level
Turbine hall +16.0m level generator
Turbine hall +16.0m level
Turbine hall +16.0m level
Turbine hall +16.0m level
Turbine hall ground floor
Cooling water underground piping to turbine hall
Cooling water underground piping to turbine hall
Cooling water underground piping to turbine hall
Cooling water underground piping to turbine hall
IPB
MCW piping to CWPH
MCW piping at road crossing
Outfall culvert turbine hall to aeration
FD & PA fan foundations - south side
Boiler Acid waste pit
Waste water treatment plant

No comments:

Post a Comment

Note: only a member of this blog may post a comment.