MCW header outlet at Turbine Hall
MCW header outlet at Turbine Hall
Cooling water piping backfilled at Turbine Hall
Turbine hall Level -5.2m
Turbine hall Level +16.0m
Turbine hall Level +0.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Lube oil room
Turbine hall Lube oil room
Turbine hall Lube oil room
Turbine hall piping insulation
Boiler PA/FA fans north side
Fabric filter
Boiler PA/FA fans north side
Boiler PA/FA fans south side
Boiler Electrical Building
Boiler PA/FA fans south side
Fabric filter view from south
Waste water treatment building
Waste water treatment electrical building
Waste water treatment electrical building
Boiler view from south
Waste water treatment building
Waste water treatment building
Waste water treatment building
Turbine Hall view from south
Boiler view from south
Boiler Electrical Building and Piperack H03
Waste water treatment building
Waste water treatment building
FGD Aeration pumps
FGD Aeration pumps
FGD Aeration basin
FGD Aeration basin
FGD Aeration basin
FGD Aeration basin
FGD view from south
Boiler view from south
Fabric filter view from south
FGD Aeration
FGD Aeration
FGD duct view from south
FGD duct view from south
FGD Absorber
FGD Absorber
Fly ash silo
Fabric filter
Fabric filter ash compressed building
Ash silos
Boiler view from north