| Boiler view from north |
| Boiler view from north |
| PA/FA fans north side |
| MCW outlet header at Turbine Hall |
| Turbine Hall piping insulation at Level +0.0m |
| MCW piping to CWPH |
| MCW piping at road diversion |
| Waste water treatment building |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |