| Steam blow piping |
| Turbine hall Level -5.2m |
| Turbine hall Level -5.2m |
| Turbine hall piping |
| Turbine hall piping |
| Turbine hall steam blow piping |
| Turbine hall Level +0.0m |
| Turbine hall Level +0.0m |
| Turbine hall |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Lube oil room |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Waste water treatment plant |
| Boiler area |
| Boiler area |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.