Overall Plant
Progress photo
| Power plant general view from North |
| Power plant general view from North |
| Fabric filter area - North |
| Boiler North side |
| Boiler FD&PA fan area - North |
| Slag Conveyer sys work |
| 89C gas storage area |
| Turbine Hall - North side |
| Auxiliary transformer area |
| Main Trannsformer area |
| Demin tank area |
| Raw water storage tank area |
| Turbine hall view from East |
| Exhaust Tank area |
| HP Heater tank insulation 11m level |
| HP Heater tank insulation 16m level |
| Turbine hall |
| Turbine hall |
| Turbine hall |
| Water pit civil work |
| Acid pit area civil work |
| Industrial water pump station |
| Turbine hall South side |
| Boiler area - South side |
| Waste water treatment area |
| Waste water treatment area equipment erection |
| Waste water treatment area |
| FGD Pump station |
| Fabric filter area - South side |
| Aeration station |
| FGD area |
| Absorber area - West side |
| Ash handling system erection |
| Ash handling system & Fabric filter area |
| Air Ash compresor building |