Boiler scraper installation |
B89b Gas storage |
MCW header at Turbine hall |
MCW header at Turbine hall |
PA/FD fans boiler north side |
Fabric filter north view |
Fabric filter air compressed station |
Crusher house |
Fabric filter view from west |
FGD absorber piping |
Prepare to lift structural steel at FGD area |
FGD view from south |
FGD aeration basin |
FGD aeration basin |
FGD aeration pumping station |
FGD view from west |
Fabric filter view from south |
PA/FD fans boiler south side |
H03 pipe rack |
Work area at boiler south side |
Air preheater washing basin |
FGD aeration pumping station |
Waste water treatment plant |
Waste water treatment plant |
Waste water treatment plant electrical building |
Plant road south side |
FGD aeration pumping station |
Fabric filter south side |
ID Fan south side |
FGD view from west |
FGD cable rack |
FGD pipe rack |
FGD work area |
FGD aeration station |
FGD aeration pumping station |
Waste water treatment plant |
Waste water treatment plant |
Waste water treatment plant |
Waste water treatment plant |
Waste water treatment plant |
Waste water treatment plant |
Waste water treatment plant |
Waste water treatment plant |
Boiler and Turbine hall view from south |
Light fuel oil tank |
Fuel oil unloading station |
Condensate make up tank |
Auxiliary boiler |
Acid waste pit ground levelling |
Unit Electrical Building |
Turbine hall view from east |
Goods hazardous store |
Tank farm |
Potable water tank |
Boiler acid waste pit |
Turbine hall view from east |
Turbine hall view from north |
B89a Gas storage |
Boiler view from north |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.