| Central Control Room at Unit Electrical Building |
| Engineering Room at Unit Electrical Building |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Turbine Hall Level +16.0m |
| Condensate Make up tank |
| Boiler acid waste pit |
| B89b Gas storage |
| MCW header outlet at Turbine Hall |
| Boiler north side scraper conveyor |
| PA/FD fans Boiler north side |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.