13.07.13 Safety tool talking

                                                      E05 - Cooling water piping sleeper


                                                E02 - Cooling water pumphouse

                                                 B01 - Boiler Pedestal Concreting           


                                              B01 - Boiler remedial strengthning work

                                                  Boiler Duct pre-assambling  in side plant
 
                                                                C40 - Piling work      