B06. Bunker Bay South Side,
reconstruction work
B06. Bunker Bay North
Rebar Installation in progress
B01. Boiler Foundation connection beam
(strengthning work) Back filling, view from North
(strengthning work) Back filling, view from South
B01. Boiler Foundation connection beam
(strengthning work) concreting, view from North
B01. Boiler Foundation connection beam
(strengthning work) concreting, view from South
B01. Boiler Foundation connection beam
(strengthning work) concreting, view from West
B01. Boiler FD Fan Foundation Concrete
B63. Turbain Hall - Piling work, view from North
B63. Turbain Hall - Bore Piling work, North Side
B63. Turbain Hall - Bore Piling work, North Side
B63. Turbain Hall - Piling work, view from South
B33. Electrical Building Ground Floor work,
view from South
B33. Electrical Building Ground Floor work,
view from North
B02. Chimney - Foundation finishing work
D01. Ash Storage - Bore piling work
E05. Cooling water piping - Sleeper's work
E50. Cooling Water Culvert - Piling work
L05. Absorber - Pile cap preparation
L13. Aeration Basin - Piling work
B01. Boiler Duct Preassembling work - Inside Plant