Friday, 19 July 2013

19.07.2013


B06. Bunker Bay South Side,
reconstruction work

B06. Bunker Bay North
Rebar Installation in progress
                                        

                                   B01. Boiler Foundation connection beam
                                (strengthning work) Back filling, view from North

                                  B01. Boiler Foundation connection beam
                                  (strengthning work) Back filling, view from South

B01. Boiler Foundation connection beam
                                (strengthning work) concreting, view from North

B01. Boiler Foundation connection beam
                                (strengthning work) concreting, view from South 

B01. Boiler Foundation connection beam
                                (strengthning work) concreting, view from West 

B01. Boiler FD Fan Foundation Concrete

B63. Turbain Hall - Piling work, view from North

B63. Turbain Hall - Bore Piling work, North Side

B63. Turbain Hall - Bore Piling work, North Side



B63. Turbain Hall -  Piling work, view from South


B33. Electrical Building Ground Floor work,
view from South

B33. Electrical Building Ground Floor work,
view from North


B02. Chimney - Foundation finishing work


D01. Ash Storage - Bore piling work


                                       E02 - Cooling Water Pump Station - concreting work

E05. Cooling water piping - Sleeper's work  


E50. Cooling Water Culvert - Piling work

L05. Absorber - Pile cap preparation


L13. Aeration Basin - Piling work

B01. Boiler Duct Preassembling work - Inside Plant