B01. Boiler steel structure general view from North |
B01. Boiler pressure parts erection |
B01. Boier pressure parts erection, view from bottom |
B01. Boiler pressure parts at site for erection |
B01. Boiler pressure parts, steel structure and duct erection, General view from West |
B06. Bunker bay area pulveriser erection |
B06. Bunker bay area Silo duct erection |
B17. Flue gas duct erection |
B33. Unit electrical building pastering work, viev fromEast |
B33. Unit electrical building, ground floor cable tray erection |
B33. Unit electrical building fire fighting work |
B33. Unit electrical building 2nd floor plastering work |
B33. Unit electrical building general view from South |
B35. Boiler electrical building ground floor cable tray erection |
B35. Boiler electrical building 1st floor |
B63. Turbine hall North side concrete piller work |
B63. Turbine hall condenser neck area |
B63. Turbine hall view from North, steel rebar installation for side wall concrete and steel structure erection |
B63. Turbine steel structure general view from Top |
B63. Turbine hall steel structure North side, over view |
B63. Turbine hall Steel structure, view from South |
B68. Auxiliary Transformer building |
B68. Main transformer Installation |
C03_C30 Light fuel oil pump station |
C40. Fuel oil storage tank area |
C72, Electrical building area |
C72. Electrical building near bunker area |
D01. Ash storage structure erection |
Turbine hall - Dosing system |
E05. Cooling water underground pipe installation |
E50. Outfal Culvert foundation |
F06. Cable way foundation |
B63. Turbine hall feedwater Pump & Motor installation |
G02. Tank area |
G05. Demin water proudction plant erection |
G07 & G20. Demin and Potable storage tank erection |
G08. Compressed air proudction plant and H03. Pipe rack foundation |
G17. Auxiliary boiler foundation |
G25. Operational industrial water pump station |
G28. Oil & fire fighting water recovery pit |
H03. Pipe rack foundation near tank area |
H03. Pipe rack foundation near Fabric filter area |
L05. Absorber shell concrete work |
L13. Aeration Basin foundation work |
L13. Aeration basin |