| B01. Boiler steel structure general view from North |
| B01. Boiler pressure parts erection |
| B01. Boier pressure parts erection, view from bottom |
| B01. Boiler pressure parts at site for erection |
| B01. Boiler pressure parts, steel structure and duct erection, General view from West |
| B06. Bunker bay area pulveriser erection |
| B06. Bunker bay area Silo duct erection |
| B17. Flue gas duct erection |
| B33. Unit electrical building pastering work, viev fromEast |
| B33. Unit electrical building, ground floor cable tray erection |
| B33. Unit electrical building fire fighting work |
| B33. Unit electrical building 2nd floor plastering work |
| B33. Unit electrical building general view from South |
| B35. Boiler electrical building ground floor cable tray erection |
| B35. Boiler electrical building 1st floor |
| B63. Turbine hall North side concrete piller work |
| B63. Turbine hall condenser neck area |
| B63. Turbine hall view from North, steel rebar installation for side wall concrete and steel structure erection |
| B63. Turbine steel structure general view from Top |
| B63. Turbine hall steel structure North side, over view |
| B63. Turbine hall Steel structure, view from South |
| B68. Auxiliary Transformer building |
| B68. Main transformer Installation |
| C03_C30 Light fuel oil pump station |
| C40. Fuel oil storage tank area |
| C72, Electrical building area |
| C72. Electrical building near bunker area |
| D01. Ash storage structure erection |
| Turbine hall - Dosing system |
| E05. Cooling water underground pipe installation |
| E50. Outfal Culvert foundation |
| F06. Cable way foundation |
| B63. Turbine hall feedwater Pump & Motor installation |
| G02. Tank area |
| G05. Demin water proudction plant erection |
| G07 & G20. Demin and Potable storage tank erection |
| G08. Compressed air proudction plant and H03. Pipe rack foundation |
| G17. Auxiliary boiler foundation |
| G25. Operational industrial water pump station |
| G28. Oil & fire fighting water recovery pit |
| H03. Pipe rack foundation near tank area |
| H03. Pipe rack foundation near Fabric filter area |
| L05. Absorber shell concrete work |
| L13. Aeration Basin foundation work |
| L13. Aeration basin |