B01. Boiler steel structure


B01. Boiler pressure parts erection


B01. Boiler pressure parts erection

B01. Boiler roof steel structure and duct erection, view from South


B01. Boiler steel structure and pressure parts erection
B07. Fabric filter Casing erection, view from West

B01. Boiler rear side steel structure erection

B06. Pulversizer erection

B07. Fabric filter casing erection

B07. Fabric filter casing erection, view from North

B17. Flue gas duct and steel structer erection,
view from South

B17. Flue gas duct and steel structure erection,
view from South

B33. Unit electrical building, 2nd floor

B33. Unit electrical building North side plastering work

B33. Unit electric building, ground floor cable tray erection

B33. Unit. elec. Ground floor fire fighting


B33. Unit. Elec. building, 1st floor

B35. Boiler electrical building ground floor cable tray erection

B35. Boiler electrical building 1st floor

B63. Turbine building, Civil & mechanical work
View from North

B63. Turbine building, Civil & steel structure work,
view from North

B63. Turbine hall HP heater installation, 11m level

B63. Turbine hall steel structure and civil work, 11m lvl

B63. T.Hall vacuum system installation

B63. T.H. - Feed water pump and motor

B68. Main transformer building and Main transformer

C03_30. Light fuel oil pump station

C05. Crusher house building

C40. Light fuel oil storage tank area

C72. Electrical building near bunkerbay - inside view

C72. Electrical building


E05. Under ground cooling water piping installation


E50. Outfall culvert From Turbine to Aeration

F06. Cable way foundaiton

G02. Tank erection

G05. Demin water production equipment erection

G05. Demin plant erection

G07 & 20 Tank erection

G28. Oil & fire fighting water recovering pit

G08. Compressed Air Building
H03. Pipe rack foundation

G17. Auxiliary boiler foundation

G25. Industrerial water pump station

L05. Absoer shell civil work

B07. Fabric filter casing erection


L13. Aeration basine civil work

L13. Aeration basine

B07. Fabric filter casing erection,
D01. Ash storage tank structure erection

B68. Auxiliary transformer building

L05. Absorber shell civil work