Thursday, 26 June 2014

26.06.2014

B01. Boiler steel structure - general view from North

B01. Pressure parts erection

B01. Boiler and pressure parts item erection,
view from bottom



B01. Duct erection, view from South


B01. Boiler steel structure, Roof steel,  & duct erection,
View from South

B01. Boiler steel structure erection & pressure parts erection
View from West

B02. Chimney flue gas duct pressembly

B06. Pulverizer erection, view from North

B06. Pulerviser erection, view from South


B07. Fabric filter casing erection

B17. Flue gad duct erection


B33. Unit electrical building, ground floor fire fighting erection

B33. Unit electrical building, ground floor cable tray erection


B33. Unit electrical building, 1st floor

B33. Unit Electrical building 2nd floor



B35. Boiler electrical building


B35. Boiler electrical building ground floor cable tray erection

B35. Boiler electrical building 1st floor


B63. Turbine hall civil work



B63. Turbine hall steel structure ereciton, view from North

B63. Turbine hall 11m level, HP Heater placed

B63. Turbine hall 11mlevel - steel structure erection overview
Turbine table concrete work



B63. Turbine hall ground level

B63. Turbine hall feed water pump and moter placed


B63. Turbine hall general view from South



B68. Main transformer installation

B68. Auxilary transformer building

C03_30 Fuel oil pump station and unloading area

D01. Ash stroage tank structure

C05. Crusher house building

C40. Light fuel oil storage

C72. Electrical building


E05. Under ground cooling water piping installation





G02. Tank erection



G05. Demin plant erection


G07 & 20. Demin tank erection

G08. Air compresser building & H03 pipe rack foundation

G17. Auxilary boiler foundation

G25. Operational water pump station






L13. Aeration basin civil work

L41: Absorber area Starting GRP pipe installation