B01. Boiler steel structure - general view from North |
B01. Pressure parts erection |
B01. Boiler and pressure parts item erection, view from bottom |
B01. Duct erection, view from South |
B01. Boiler steel structure, Roof steel, & duct erection, View from South |
B01. Boiler steel structure erection & pressure parts erection View from West |
B02. Chimney flue gas duct pressembly |
B06. Pulverizer erection, view from North |
B06. Pulerviser erection, view from South |
B07. Fabric filter casing erection |
B17. Flue gad duct erection |
B33. Unit electrical building, ground floor fire fighting erection |
B33. Unit electrical building, ground floor cable tray erection |
B33. Unit electrical building, 1st floor |
B33. Unit Electrical building 2nd floor |
B35. Boiler electrical building |
B35. Boiler electrical building ground floor cable tray erection |
B35. Boiler electrical building 1st floor |
B63. Turbine hall civil work |
B63. Turbine hall steel structure ereciton, view from North |
B63. Turbine hall 11m level, HP Heater placed |
B63. Turbine hall 11mlevel - steel structure erection overview Turbine table concrete work |
B63. Turbine hall ground level |
B63. Turbine hall feed water pump and moter placed |
B63. Turbine hall general view from South |
B68. Main transformer installation |
B68. Auxilary transformer building |
C03_30 Fuel oil pump station and unloading area |
D01. Ash stroage tank structure |
C05. Crusher house building |
C40. Light fuel oil storage |
C72. Electrical building |
E05. Under ground cooling water piping installation |
G02. Tank erection |
G05. Demin plant erection |
G07 & 20. Demin tank erection |
G08. Air compresser building & H03 pipe rack foundation |
G17. Auxilary boiler foundation |
G25. Operational water pump station |
L13. Aeration basin civil work |
L41: Absorber area Starting GRP pipe installation |