| B01.Boiler steel structure, General view North |
| B01. Boiler pressure parts erection, view from North |
| B01. Pressure parts erection |
| B01. Pressure parts at site for lift |
| B01. Boiler steel structure, view from East |
| B01. Boiler steel structure, duct and pressure parts erection |
| B01. Boiler steel structure, & pressur parts erection B07. Fabric filter casing erection |
| B02. Insulator can assembly |
| B06. Bunker bay area pulverizor erection |
| B07. Fabric filter casing erection |
| B17. Flue gas duct & steel structure erection |
| B33. Unit electrical building, view from South |
| B33. Unit electrical building 1st floor |
| B33. Unit electrical building 2nd floor |
| B35. Boiler electrical building ground floor cable tray erection |
| B35. Boiler electrical building 1st floor |
| B63. Turbine Hall 11+level HP heater placed |
| B63. Turbine hall North side piller erection |
| B63. Turbine hall Condenser area civil work |
| B63. Turbine hall general view from North |
| B63. Turbine hall general view from North |
| B63. Turbine hall Steel structure erection, view from South |
| B63. Turbine hall |
| B63. Turbine hall feed water pump |
| B63. Turbine hall steel structure erection over view |
| B68. Main Transformer installation |
| B68. Auxiliary transformer building |
| C03/30 Light fuel oil pump station foundation work |
| C05. Crusher house building |
| C40. Light fuel oil storage |
| C71. Electrical building near C ursher house |
| C72. Electrical building near bunker bay |
| D01. Ash storage |
| E05. Under ground cooling water piping installation |
| E50. Outfall culver Turbine hall to Aeration basin |
| F06. Cable way foundation |
| G02. Tank erection over view |
| G05. Demin water production plant erection |
| Add caption |
| G07 & G20. Demineralized water tank erection |
| G08. Compressed air proudction plant building H03. Pipe rack foundation |
| G17. Auxiliary boiler foundation |
| G25. Operation industrial water pump station |
| H03. Pipe rack foundation |
| L05. Absorber shell concrete work |
| L13. Aeration basin |