Boiler area general view from North
Entrance of site
 |
B01. Boiler cool and air duct, and preheater erection |
 |
B01. Boiler furnace wall assembly |
 |
B01. Boiler furnance wall for erection |
 |
B63. Turbine hall area large bore pipe erection |
 |
B01. Boiler steel structure,& hot and cool air duct erection |
 |
B01. Boiler duct erection, view from South |
 |
B01. Boiler area general view from South |
 |
B02. Chimeny Flue Gas container erection |
 |
B02. Chimeny lining application |
 |
B06. Bunker area Pulveriser erection, view from North |
 |
B06. Pulverizer erection, view from South |
 |
B07. Fabric filter casing erection, view from north |
 |
B07. Fabric filter casing erection, view from West |
 |
B17. Flue gas duct and steel structure erection, view from South |
 |
B17. Fabric filter steel structure and duct erection |
 |
B35. Boiler electrical building, cable pulling |
 |
B33. Unit electrical building cable pulling |
 |
B33. Unit electrical building painting |
 |
B33. First floor panel erection |
 |
B33. !st floor LV panel erection |
 |
B33. Unit electrical building control room area |
 |
B33. Unit electrical building roof area,, HVAC work |
 |
B33. Feed water pump alignment |
 |
b35. Boiler electrical building |
 |
B35. Cable puling |
 |
B63. Turbine hall Cooling water outlet piping area |
 |
B63. Large bore piping |
 |
B63. Large bore piping |
 |
B63. Turbine hall view from North |
 |
B63. Turbine hall area North side civil work |
 |
B63. Turbine hall general view from North |
 |
B63. Turbine hall lvl 16 |
 |
B63. Turbine hall condenser neck |
 |
B63. Cooling water outlet piping area |
 |
B06. Pulverizer erection |
 |
B63. Turbine hall general view from South |
 |
B68. Auxiliary transformer |
 |
B68. Main transformer erection |
 |
C03_30 Light fuel oil pump station area |
 |
C05. Crusher house civil work |
 |
L40. Light fuel oil stroage tank erection |
 |
D01. Ash storage tank erection |
 |
E05. Cooling water under ground piping saddel foundation |
 |
E05. Under ground cooling water piping installation |
 |
E50. Turbine hall to Aeration basin outfall foundation work |
 |
HV cable steel support installation |
 |
G02 Raw water supply storage tank erection |
 |
G05. Demin plant erection |
 |
G07. Demin storage tank erection |
 |
G08. Air compressed building |
 |
G16. Waiste water treatment plant |
 |
G17. Auxiliary boiler heater erection |
 |
G17. Auxilary boiler erection |
 |
G20. Potable water stroage tank erection |
 |
G25. pump station erection |
 |
G25. Water pump station and G02 tank erection |
 |
G08. Recovery pit |
 |
Ho3 Pipe rack erection |
 |
H03 pipe rack erection |
 |
L10. Booster fan area erection |
 |
L10. Booster fan area |
 |
L13. GRP Piping erection |
 |
L43. Absorber discharge and supply pipe foundation |