Power Block
B01. Boiler area general view from North |
B01. Boiler erection |
B01. Boiler and duct erection |
B01. Preheater erection |
B01. Boiler preassure parts and duct erection |
B01. Boiler Duct. roof steel structure erection, view from South |
B01. Boiler Hot & Cool air duct erection |
B01. Boiler steel structure and duct erection view from West |
B01. Boiler hot and cool air duct erection, view from North |
B06. Bunker bay pulverizer erection, view from North |
B06. Bunker bay area Pulverizer erection |
B06. Fabric filter erection, view from South |
B17. Flue gas duct and steel structure erection |
B17. Flue gas duct & steel structure erection, View from East |
G28. OIl & Fire fight water recovery pit |
B33. Unit electrical building ground floor, MV/LV cable pulling |
B33. Unit electrical building, Switch gear panel board installation |
B33. Unit electrical building 1st floor panel installation |
B33. Unit electrcal building panel installation |
B33. Unit electrical building 2nd floor |
B33. Ground floor Cable pulling |
B33. U. electrical building 2nd floor |
B33. U. electrical building 3rd floor, control room area |
B33. U. Electrical building fire fighting work |
B33.. U. electrical building, view from East Cable pulling |
B33. Unit electrical building general view from South |
B35. Boiler electrical building cable pulling |
B63. Turbine building, cooling water out piping area |
B63. Turbine hall, view from North Civil, Mechanical erection |
B63. Turbine hall general view from North Civil and mechanical work |
B63. Turbine hall 16m lvl heater erection |
B63. Turbine hall general view from South |
B63. Turbine hall ground floor large bore pipeing erection |
B63. Feed water pump & motor erection |
Condenser Neck erection |
B63. Turbine hall heat exchanger erection |
B63. Turbine hall - Inlet Main cooling pipe erection |
B63. Turbine hall - cooling feed water pump erection, - 0 lvl |
B63. Turbine hall general view from South |