Power Block area
| B01. Boiler Hot & Cool Air Duct erection |
| B01. Boiler erection |
| B01. Boilere pressure parts erection |
| B01. Boiler roof steel structure, Hot and Cool air duct erection |
| B01. Duct erection, general view from South |
| B01. Boiler steel structure view from West |
| B02. Chiminey Flue Liner duct erecction |
| B63. Turbine hall, civil and mechanical work view from North |
| B06. Pulerviser erection |
| Turbine table |
| B63. Turbine hall North - Civil Slab concrete steel rebar installation |
| B63. Turbine hall general view from North |
| B06. Pulverizer erection, view from South |
| B17. Flue gas duct assembly & erection |
| B07. Fabric filter casing erection, view from West |
| B17. Flue gas duct and steel structure erection |
| B33. Unit electrical building ground floor, fire figthting work, cable tray erection |
| B33. Unit electrical building, cable pulling |
| B33. Unit electrical building ground floor cable pulling |
| B33. Auxiliary transformer |
| B33. 1st floor Panel board installation |
| B33. Switch gear panel installation |
| B33. 1st floor Switch gear panel installation |
| B33. Switch gear panel installation |
| B33. 2nd floor - Switch gear panel installation |
| B33. 2nd floor Fire fighting work |
| B33. Cable pulling |
| B33. Unit electical building Plastering work |
| B35. Boiler electrical building, view from South |
| B35, Auxilary transformer |
| B63. Turbine hall overhead crane |
| B63. Turbine hall 16 m lvl |
| B63. Large bore pipe erection |
| B63. Turbine hall ground floor |
| B63. Turbine hall steel structure, general view from South |
| B68. Main transformer erection |
| B68. Auxiliary transformer erection |
| C03_30 Fuel oil pump station area |
| C05. Crusher house |
| C40. Fuel oil stroage tank erection |
| D01. Ash storage structure |
| E05. Cooling water underground piping sleeper foundation |
| E50. Outfal Culver foundation Turbine hall to Aeration |
| F06. Cable way foundation, cable way rack |
| G02. Row water supply storage tank erection |
| G05. Demin plant steel structure erection |
| G05. Demin plant equipment erection |
| G07. Demin water stroage tank erection |
| G08. Compressed air Building, compresser equipment at site |
| G17. Auxiliary boiler installation |
| G25. Water pump station & G02 Tank erection |
| B01. Air pre heater erection |
| H01. Pipe rack erection |
| L10. Booster fan area |
| L05. Absorber and FGD Duct foundation |