Power Block general view from North
|
B01. Boiler Hot and cool air duct |
|
B01. Boiler erection |
|
B01. Boiler, duct & pressure parts erection, view from bottom |
|
Air pre heater erection |
|
B01. Piping erection |
|
B63. Turbine hall large bore pipe erection |
|
B01. Boiler panel pressembly |
|
B06. Bunker bay area pulverizer erection |
|
B06. Bunker bay area, pulverizer erection, view from South |
|
B06. Fabric filter casing erection |
|
B17. Flue gas duct and steel structure erection |
|
B17. Flue gas duct erection |
|
B33. Unit electrical builind cable pulling |
|
B33. Cable pulling |
|
B33. Unit electrical building 1st floor LV switchgear panel installation |
|
2nd floor Panel erection |
|
B33. 3rd floor - control room area civil work |
|
B33. Cable pulling |
|
B33. Unit electrical building, plastering and painting, view from South |
|
B35. Boiler electrical building, Auxiliary transformer |
|
B35. Boiler electrical building cable pulling |
|
B63. Turbine hall Cooling water outlet pipe walve erection |
|
B63. Turbine hall general view from North
Civil and mechanical erection |
|
B63. Turbine hall, general veiw from North
Civil and mechanical erection |
|
B63. Turbine hall main cooling water inlet pipe ereciton |
|
B63. Main feed water pump alignment |
|
B63. Turbine hall condenser neck erection |
|
B63. Turbine hall -5.2 m level civil work |
|
B63. Turbine hall 16 m lvl |
|
B63. Turbine hall 16 m level, Turbine table and heater |
|
B63. Turbine hall general view from South |
|
B01. Boiler duct & steel erection |
|
B68. Main transformer erection |
|
B68. Auxilary transformer erection |
|
C03 Fuel oil pumpstation civil work |
|
C05. Crusher house |
|
C40. Fuel oil tank erection |
|
C72. Electrical building and tower |
|
D01. Ash stroage tank structure |
|
E05. Coooling water under ground pipe erection |
|
E50. Outfall culvert - turbine hall to Aeration base |
|
F06. Cable bay found |
|
G02. Raw water supply storage tank erection |
|
G05. Demin plant steel structure erection
G07. Tank erection |
|
G05. Demin plant equipment erection |
|
G07. Demin tank erection |
|
G28. Recovery pit concrete rebar installation |
|
G08. Compressed air building |
|
G17 Auxiliary boiler erection |
|
G20. potable tank erection |
|
G25. Water pump station bulding, and G02 tank erection |
|
G28. concrete rebar installation |
|
L05. Absorber shell & GRP flange arranging |
|
H03. Pipe rack |