Power Block general view from North
 |
B01. Boiler Hot and cool air duct |
 |
B01. Boiler erection |
 |
B01. Boiler, duct & pressure parts erection, view from bottom |
 |
Air pre heater erection |
 |
B01. Piping erection |
 |
B63. Turbine hall large bore pipe erection |
 |
B01. Boiler panel pressembly |
 |
B06. Bunker bay area pulverizer erection |
 |
B06. Bunker bay area, pulverizer erection, view from South |
 |
B06. Fabric filter casing erection |
 |
B17. Flue gas duct and steel structure erection |
 |
B17. Flue gas duct erection |
 |
B33. Unit electrical builind cable pulling |
 |
B33. Cable pulling |
 |
B33. Unit electrical building 1st floor LV switchgear panel installation |
 |
2nd floor Panel erection |
 |
B33. 3rd floor - control room area civil work |
 |
B33. Cable pulling |
 |
B33. Unit electrical building, plastering and painting, view from South |
 |
B35. Boiler electrical building, Auxiliary transformer |
 |
B35. Boiler electrical building cable pulling |
 |
B63. Turbine hall Cooling water outlet pipe walve erection |
 |
B63. Turbine hall general view from North
Civil and mechanical erection |
 |
B63. Turbine hall, general veiw from North
Civil and mechanical erection |
 |
B63. Turbine hall main cooling water inlet pipe ereciton |
 |
B63. Main feed water pump alignment |
 |
B63. Turbine hall condenser neck erection |
 |
B63. Turbine hall -5.2 m level civil work |
 |
B63. Turbine hall 16 m lvl |
 |
B63. Turbine hall 16 m level, Turbine table and heater |
 |
B63. Turbine hall general view from South |
 |
B01. Boiler duct & steel erection |
 |
B68. Main transformer erection |
 |
B68. Auxilary transformer erection |
 |
C03 Fuel oil pumpstation civil work |
 |
C05. Crusher house |
 |
C40. Fuel oil tank erection |
 |
C72. Electrical building and tower |
 |
D01. Ash stroage tank structure |
 |
E05. Coooling water under ground pipe erection |
 |
E50. Outfall culvert - turbine hall to Aeration base |
 |
F06. Cable bay found |
 |
G02. Raw water supply storage tank erection |
 |
G05. Demin plant steel structure erection
G07. Tank erection |
 |
G05. Demin plant equipment erection |
 |
G07. Demin tank erection |
 |
G28. Recovery pit concrete rebar installation |
 |
G08. Compressed air building |
 |
G17 Auxiliary boiler erection |
 |
G20. potable tank erection |
 |
G25. Water pump station bulding, and G02 tank erection |
 |
G28. concrete rebar installation |
 |
L05. Absorber shell & GRP flange arranging |
 |
H03. Pipe rack |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.