| B01. Boiler area general view from North |
| B01. Boiler erection |
| B01. Boiler and pressure parts erection |
| B01. Boiler duct & steel structure erection |
| B01. Preheater erection |
| B01. Boiler area general view from West |
| B06. Bunker bay area pulverizer erection |
| B06. Bunker area Pulverizer erection, view from South |
| B07. Fabric filter casing erection |
| B17. Flue gas duct and steel structure erection |
| B17. Booster fan area |
| B33. Unit electric building, MV/LV cable pulling |
| B33. 1st floor, MV panel erection |
| B33. Ground floor MV/LV cable pulling |
| B33. LV panel erection |
| B68. Auxiliary transformer erection |
| B33. Unit electric building, plastering and painting, view from South |
| B35. Boiler electric building, cable pulling |
| B35. Boiler electrical building panel erection |
| B35. Auxiliary transformer erection |
| B63. Turbine hall general view from North, slab concrete |
| B63. Turbine hall general view from North, Civil and mechanical erection |
| B63. Slab concrete |
| B63. -0 level slab concrete work |
| B63. - 5.2 m lvl Heat exchanger erection |
| B63. - 5.2 Feed water cooling pump |
| B63. Main cooling water inlet pipe |
| B63. - 0 level Cable tray erection |
| B63. Ground floor Feed water pump and motor alignment |
| B63. Cooling water out let pipe |
| B63. Condenser neck erection |
| B63. Large bore pipe erection |
| B68. Main transformer erection |
| C03_30 Fuel oil pump foundation area |
| C05. Crusher house area |
| D01. Ash storage structure |
| E05. Cooling water underground pipe erection |
| E50. Outfal culver Turbine hall to Aeration basine |
| F06. Cabe way foundation, steel support erection |
| G02. Raw water supply storage tank |
| G05. Demin plantation equipment erection |
| G07. Potable water stroage tank erection |
| G05. Demin plant steel structure erection |
| G08. Air compresser building |
| G16. Waste water treatment plant |
| G17. Auxiliary boiler erection |
| G17. Auxiliary boiler erection overall view |
| G25. Water pump station building |
| H03. Pipe rack |
| G28. water recovery pit |
| L13. Aeration basine piping erection |
| L13 Aeration chanel, GRP header and pipe installation |
| C40. Fuel oil stroage tank erection |
| L43. Absorber supply and discharge piping foundation |