| Boiler north view |
| Underground cabling near boiler north |
| Fabric filter north view |
| Turbine building ground floor masonry wall |
| Turbine building condenser module |
| Turbine building lube oil room |
| Turbine building +8.0m level piping |
| Turbine building +16.0m level |
| Turbine building +16.0m level |
| Turbine building +16.0m level |
| Turbine building +16.0m level |
| Turbine building +16.0m level |
| Turbine building +16.0m level |
| Turbine building +16.0m level |
| Turbine building +16.0m level |
| ID fan |
| Cooling water underground piping saddle foundation |
| Platform between Turbine building and Unit Electrical building |
| Boiler Electrical building south view |
| FGD aeration basin |
| Outfall culvert Turbine hall |
| Outfall culvert Turbine hall |
| Piperack H03 and Condensate Make up tank |
| Cable pulling for Piperack H03 |
| Cable tray at Light fuel oil pump station |
| Cable tray at Light fuel oil pump station |
| Cabling at Light fuel oil pump station |
| Light fuel oil pump station |
| Light fuel oil pump station |
| Light fuel oil pump station |
| Light fuel oil pump station unloading area |
| Light fuel oil storage tank |
| MCW piping |
| Crusher house |
| BC-23AB |